1 BOEING SUFFERS NEW 737 MAX ISSUE THAT COULD DELAY RETURN WWW.BBC.COM PUBLISHED:2019/06/27      2 RENEWABLE ENERGY SOURCES IN THE US NOW OUTSTRIP COAL WWW.MINING.COM PUBLISHED:2019/06/27      3 PEOPLE IN NEED AND MERCY CORPS SUPPORT BUILDING RESILIENCE TO DISASTERS IN RURAL MONGOLIA WWW.MONTSAME.MN PUBLISHED:2019/06/27      4 PETRO MATAD PROVIDES UPDATE ON MONGOLIA OPERATIONS WWW.ENERGY-PEDIA.COM PUBLISHED:2019/06/27      5 RUSSIAN RAILWAYS WANTS MORE TRANSIT CONTAINERS FROM CHINA VIA MONGOLIA WWW.RAILFREIGHT.COM PUBLISHED:2019/06/27      6 CHINESE MEDICAL TEAM PROVIDES FREE SURGERIES TO CATARACT PATIENTS IN MONGOLIA WWW.XINHUANET.COM PUBLISHED:2019/06/27      7 DEMOCRATIC BUT DEADLOCKED, MONGOLIA BRACES FOR 'INEVITABLE' POLITICAL CHANGE WWW.REUTERS.COM PUBLISHED:2019/06/27      8 EXPLORATION PLAY IN MONGOLIA FOCUSES ON PROMISING TARGETS WWW.STREETWISEREPORTS.COM PUBLISHED:2019/06/27      9 MONGOLIA-UN JOINT STEERING COMMITTEE CONVENES WWW.MONTSAME.MN PUBLISHED:2019/06/26      10 CHINA BLOCKS ALL CANADIAN MEAT IMPORTS AS TRADE WAR WITH US HEATS UP WWW.RT.COM PUBLISHED:2019/06/26      Д.СУМЪЯАБАЗАР: ШАТАХУУНЫ ҮНИЙГ 120 ТӨГРӨГӨӨР БУУРУУЛНА WWW.EAGLE.MN НИЙТЭЛСЭН:2019/06/27     ДЭЛХИЙД АЛТНЫ ҮНЭ ӨСӨЖ БАЙГАА Ч АЛТ ТУШААЛТ НЭМЭГДЭЭГҮЙ WWW.EAGLE.MN НИЙТЭЛСЭН:2019/06/27     УУХҮЯ: V САРД АШИГТ МАЛТМАЛЫН ХАЙГУУЛЫН 3 ЛИЦЕНЗ ШИНЭЭР ОЛГОСОН WWW.BLOOMBERGTV.MN  НИЙТЭЛСЭН:2019/06/27     ЗАСГИЙН ГАЗРЫН ИЛҮҮ ДЭВШИЛТЭТ БОНД ИРЭХ ОНД “МЭНДЭЛНЭ” WWW.ZGM.MN НИЙТЭЛСЭН:2019/06/27     НИК ХХК-ИЙН ТУЗ-ИЙН ДАРГА Ч.ДАВААНЯМ ТАМИРЧИН О.ДӨЛГӨӨНИЙ ЭМЧИЛГЭЭНД 10,000$ ХАНДИВЛАВ WWW.IKON.MN НИЙТЭЛСЭН:2019/06/27     МОНГОЛЫН БАРУУН БҮСЭД ОРШИН СУУХ ИРГЭНД НОГДОХ ДНБ ЗИМБАБВЕГИЙН ДАРАА ОРЖ БАЙНА WWW.IKON.MN НИЙТЭЛСЭН:2019/06/27     ДОРНОДЫН БАЯНДУНГААС 2000 ЖИЛИЙН ӨМНӨХ ХҮДЭР ХАЙЛУУЛАХ ЗУУХ ОЛЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2019/06/27     4.6 КГ АЛТ ЭКСПОРТОЛЖЭЭ WWW.EAGLE.MN  НИЙТЭЛСЭН:2019/06/27     “VIKING MINES” МОНГОЛ ДАХЬ ХӨРӨНГӨӨ ХУДАЛДАЖ ЧАДСАНГҮЙ WWW.BLOOMBERGTV.MN  НИЙТЭЛСЭН:2019/06/26     АЛТНЫ СПОТ ХАНШ 1439 АМ.ДОЛЛАР ХҮРТЭЛ ӨСӨЖ,СҮҮЛИЙН 6 ЖИЛИЙН ДЭЭД ТҮВШИНД ХҮРЛЭЭ WWW.BLOOMBERGTV.MN НИЙТЭЛСЭН:2019/06/26    

Experience Centre Service (OT)

Supply of Oyu Tolgoi Experience Centre Service

Tender number: WS1711267069
Open date: 2019-04-03 00:00
Close date: 2019-04-24 17:00
Planned contract award period:
 

Oyu Tolgoi” LLC (the 'Company') would like to invite potential and/or experienced suppliers to submit their Expression of Interest (EOI) in relation to Supply of “Oyu Tolgoi Experience Centre Service”

[An EOI is only a preliminary step to a formal tender process to understand and identify whether there are potential suppliers in the market that are interested in and capable of satisfying the procurement needs]

The supplier will be required to carry out all of, but not limited to, the following work

Scope description:

a.Venue

b.Centre fit-out/reconstruction

c.Management Service

GENERAL STANDARDS AND REQUIREMENTS:

a. Venue:

  • Location-wise, venue that is in a walking distance from the “Oyu Tolgoi LLC” office (Monnis Tower), or closer.
  • The ideal size is 350~650sqms with a high ceiling (3.5-6 meters preferred).
  • Separate room for training which capacity is at least 16 people.
  • Must fulfill all of OT’s and national safety standards and requirements (Fire and emergency exits, sprinklers, smoke detectors etc.)
  • CCTV system is required
  • If required, separate IT room to manage screens, CCTV and other IT equipments
  • Should be at ground or 1st floor of the building

b. Centre fit-out/reconstruction:

  • OT General introduction section
  • Safety section
  • Operations section
  • Underground tunnel
  • HR, Education section
  • Procurement section
  • Community section
  • OT Induction room

Additionally:

  • Reception
  • Tea corner
  • Open area with high quality projector and screen
  • Need to cover below facilities and equipment:
    • Real demonstrations (Cage entrance, concentrate, simulators, site map, equipment etc.)
    • Virtual Reality of Underground, Concentrator, Open Pit
    • High tech screens to provide information of all departments

c. Management service:

  • Manage daily operation of the center
  • Centers’ workforce recruitment, training and on boarding
  • Cooperation with OT respective departments on required content
  • Provide real experience and delivering value of Oyu Tolgoi to visitors and public
  • Actively distribute OT’s announced programs and tender information
  • Take full responsibility for fully function of the center equipment
  • Hold ceremonies, events, high official meetings, team offsite etc which are originated from OT LLC and internal clubs
  • If required, will organize events and activities to appeal public to the center

Mandatory documents:

  • State registration certificate (copy)*
  • HSE policy & procedures (copy)*
  • Business Code of Conduct (copy)*
  • Audited Financial statement from last 3 years (copy)*
  • Special license/permit
  • Brief introduction of company (copy)*
    • Ownership/ shareholder information such as Company charter (copy)*
    • Executive team structure/ introduction (copy)*
    • Organization structure & Total manpower (copy)*

* - If latest copies are not uploaded in “Oyu” Supplier Database, please upload in the “Additional attachment” field.

Scope specific documents:

  • General information of location/place related to the scope of the work
  • A brief description of the plan and draft of task

Any interested suppliers who wishes to participate in the EOI, must be registered in “Oyu” supplier database. If you have not registered in “Oyu” database, please register at https://oyu-supplierdatabase.ot.mn/.

Information session events will be organized according to below schedule. We welcome any interested companies and people. Please contact SupplierSessions@ot.mn for registration of Information session event.

  • Maximum 2 personnel can be registered for a company

Where

When

Deadline for Info Session registration

Registration contact

Ulaanbaatar city

19 April 2017

17 April 2019

SupplierSessions@ot.mn

EOI documents must be prepared in Mongolian and/or English and must be submitted via “Oyu” Supplier database before 5pm, (Ulaanbaatar time) 24 April 2019.

Important notice:

  • The Company is only seeking Expression of Interest from potential suppliers and makes no representation or promise in relation to procuring work from a supplier or suppliers.
  • The Company reserves the right to refuse any document(s) which is incomplete or submitted after the specified date & time.
  • The Company will not accept any EOIs stored in internet storage or in any other webpages and links.
  • The Company will not be responsible for any costs associated with preparing and submitting an Expression of Interest to the Company.
  • There will be no Questions and Answers provided during the EOI process.

“OYU TOLGOI” LLC

PROCUREMENT DEPARTMENT