1 LEGAL REFORMS IN MONGOLIA’S EXTRACTIVE SECTOR WWW.EN.MININGINSIGHT.MN  PUBLISHED:2025/12/24      2 ICONIC SAMUEL BECKETT BRIDGE TO BE ILLUMINATED IN MONGOLIA’S NATIONAL FLAG WWW.MONTSAME.MN PUBLISHED:2025/12/24      3 TUGRUG DEPOSITS RISE BY MNT 3.7 TRILLION WWW.MONTSAME.MN PUBLISHED:2025/12/24      4 CHINA DENIES REPORT OF 100 ICBMS IN BORDER SILOS, URGES U.S. CUTS WWW.UPI.COM PUBLISHED:2025/12/24      5 ERENHOT, LARGEST LAND PORT ON CHINA-MONGOLIA BORDER, SEES RISE IN CROSS-BORDER TRAFFIC VOLUMES WWW.XINHUANET.COM PUBLISHED:2025/12/24      6 CLIMATE RISKS ARE BECOMING FINANCIAL RISKS: WHAT MONGOLIA’S EXPERIENCE REVEALS WWW.UNESCAP.ORG PUBLISHED:2025/12/24      7 4.5 MAGNITUDE EARTHQUAKE HITS SOUTHWESTERN MONGOLIA WWW.XINHUANET.COM PUBLISHED:2025/12/24      8 ENTRÉE RESOURCES PROVIDES UPDATE ON ENTRÉE/OYU TOLGOI JOINT VENTURE LICENSE MATTERS WWW.INVESTINGNEWS.COM PUBLISHED:2025/12/23      9 CHINA QUIETLY LOADS 100+ ICBMS INTO NEW MISSILE SILOS NEAR MONGOLIA: REPORT WWW.FOXNEWS.MN PUBLISHED:2025/12/23      10 MONGOLIA PRESENTS PILOT RESULTS OF NATIONAL MULTIDIMENSIONAL POVERTY INDEX WWW.AKIPRESS.COM PUBLISHED:2025/12/23      “УЛААНБААТАР МЕТРО ТӨСӨЛ”-ИЙН ТЕНДЕРИЙН ХОЁРДУГААР ШАТНЫ ШАЛГАРУУЛАЛТ ЗАРЛАГДЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/24     2026-2028 ОНД ДУЛААНЫ ТАВДУГААР ЦАХИЛГААН СТАНЦЫГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР БАРИНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24     ХОГ ШАТААЖ, ЭРЧИМ ХҮЧ ГАРГАХ ҮЙЛДВЭРИЙН БАРИЛГА УГСРАЛТЫН АЖЛЫГ 2026 ОНД ЭХЛҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24     АЙЛ ӨРХ, ОРОН НУТГИЙН ХЭМЖЭЭНД СЭРГЭЭГДЭХ ЭРЧИМ ХҮЧНИЙ ХЭРЭГЛЭЭГ НЭМЭГДҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/24     ТӨРИЙН ӨМЧИЙН 8 КОМПАНИЙГ ХУВЬЧИЛЖ, 18-ЫГ НЭЭЛТТЭЙ ХУВЬЦААТ КОМПАНИ БОЛГОНО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/24     80,000 ГАРУЙ ТАТВАР ТӨЛӨГЧ 1.29 ИХ НАЯД ТӨГРӨГИЙН ТАТВАР ТӨЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/12/24     ДЭНЖИЙН МЯНГА 93 МВТ ХИЙН ДУЛААНЫ СТАНЦЫГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР БАРИНА WWW.GOGO.MN НИЙТЭЛСЭН:2025/12/24     НИЙСЛЭЛИЙН 2026 ОНЫ ТӨСВӨӨР ШИНЭЭР 207 ТӨСӨЛ, АРГА ХЭМЖЭЭ ХЭРЭГЖҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/12/23     БНХАУ 100 ГАРУЙ ТИВ АЛГАСАГЧ ПУУЖИНГ МОНГОЛЫН ОЙРОЛЦОО БАЙРШУУЛСАН БАЙЖ БОЛЗОШГҮЙ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/23     ТӨГРӨГИЙН АМ.ДОЛЛАРТАЙ ХАРЬЦАХ ХАНШ 158 ТӨГРӨГӨӨР СУЛАРЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/22    

China-funded overpass in Mongolia opens to traffic www.xinhuanet.com

ULAN BATOR, Sept. 16 (Xinhua) -- An overpass built with the Chinese government's soft loan near the Traffic Police Department of Mongolia in downtown Ulan Bator opened to traffic on Monday.

The construction of the 1,100-meter overpass, which started in April last year, was built by China Railway 20 Bureau Group Co., Ltd.

Witnesses at the opening ceremony include senior officials from China and Mongolia: the Chinese Ambassador to Mongolia Xing Haiming, Mongolian Prime Minister Ukhnaa Khurelsukh, Mongolian Minister of Road and Transport Development Byambasuren Enkh-Amgalan and Mayor of Mongolia's capital Ulan Bator Sainbuyan Amarsaikhan.

The Chinese ambassador expressed hope that the overpass can effectively reduce the interference of railways on municipal roads, reduce traffic congestion, facilitate travel for citizens, and play an important role in accelerating the modernization of Ulan Bator's road traffic.

For his part, the Mongolian prime minister expressed his sincere thanks to the Chinese side for the strong support and assistance to Mongolia's development.

"Ulan Bator was originally built with a plan to have 500,000 residents. Today, the city has become a big city home to around half of the country's population of 3.2 million," Khurelsukh said at the ceremony.

"As the city expands, the country has been suffering urban diseases, especially traffic jam. I am fully confident that the China-funded overpass can contribute significantly to reduce traffic congestion in the capital city," said Khurelsukh.

At the occasion, Xing said that the 2019 year marks the 70th anniversary of the establishment of China-Mongolia diplomatic relations, the 25th anniversary of the revision of the Treaty on Friendship and Cooperation between China and Mongolia, and the 5th anniversary of the establishment of a comprehensive strategic partnership.

This year, the pragmatic bilateral cooperation ushered in a bumper harvest, with a number of major cooperation projects completed, said Xing.

Since the beginning of this year, with Chinese non-refundable aid and soft loans, several such high-standard and modern facilities as a development center for disabled children, highways, overpasses and agricultural machinery have been handed over to the Mongolian side, reflecting the high level of pragmatic cooperation between the two countries, according to the ambassador.



Published Date:2019-09-17