1 CONSTRUCTION OF WASTE-TO-ENERGY PLANT TO BEGIN IN 2026 WWW.GOGO.MN PUBLISHED:2025/12/25      2 SECURITIES TRADING REACHES MNT 879.5 BILLION WWW.MONTSAME.MN PUBLISHED:2025/12/25      3 PROPOSAL, CONCLUSION ON DETERMINING THE STATE OWNERSHIP STAKES IN 'ACHIT IKHT', 'ERDENET MINING', AND 'ZES ERDENIIN KHUVI' LLCS TO BE DISCUSSED WWW.MONTSAME.MN PUBLISHED:2025/12/25      4 'MONGOLIAN JINGLE BELLS' GOES VIRAL AS PEOPLE THINK IT'S THE 'BEST VERSION EVER' WWW.UNILAD.COM PUBLISHED:2025/12/25      5 POLICE CHARGE MONGOLIAN EMBASSY WORKER FOR DRUNK DRIVING RESULTING IN 3-VEHICLE CRASH WWW.KOREAJOONGANGDAILY.JOINS.COM  PUBLISHED:2025/12/25      6 SECOND-STAGE EPC+F TENDER ANNOUNCED FOR ULAANBAATAR METRO PROJECT WWW.MONTSAME.MN PUBLISHED:2025/12/25      7 ULAANBAATAR GRAND SLAM TO OPEN OLYMPIC RANKING CYCLE WWW.MONTSAME.MN PUBLISHED:2025/12/25      8 LEGAL REFORMS IN MONGOLIA’S EXTRACTIVE SECTOR WWW.EN.MININGINSIGHT.MN  PUBLISHED:2025/12/24      9 ICONIC SAMUEL BECKETT BRIDGE TO BE ILLUMINATED IN MONGOLIA’S NATIONAL FLAG WWW.MONTSAME.MN PUBLISHED:2025/12/24      10 TUGRUG DEPOSITS RISE BY MNT 3.7 TRILLION WWW.MONTSAME.MN PUBLISHED:2025/12/24      ГАЗАР ЭЗЭМШИХ ГЭРЧИЛГЭЭГ ОЛГОЖ ЭХЭЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/12/25     ИРЭХ ОНЫ ЭХНИЙ УЛИРАЛД “АЧИТ ИХТ”, “ЭРДМИН”, “ЗЭС ЭРДЭНИЙН ХУВЬ” ХХК-Д ТӨРИЙН ЭЗЭМШЛИЙН ХУВЬ ХЭМЖЭЭГ ТОГТООХЫГ ҮҮРЭГДЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/25     2026 ОНД ЮУНД ХӨРӨНГӨ ОРУУЛБАЛ АШИГТАЙ БАЙХ ВЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/25     2026 ОНЫ НЭГДҮГЭЭР САРЫН 1-ЭЭС ХЭРЭГЖИХ ХУУЛЬ, ТОГТООМЖУУД WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/25     ДАТА: БҮРТГЭЛТЭЙ 281,000 ААН-ЭЭС 118,000 НЬ ҮЙЛ АЖИЛЛАГАА ЯВУУЛЖ, 72,000 НЬ ТАТВАРЫН ӨРТЭЙГӨӨС 16,000 НЬ ДАНСАА ХААЛГАСАН WWW.EGUUR.MN НИЙТЭЛСЭН:2025/12/25     БНСУ ДАХЬ МОНГОЛ УЛСЫН ЭЛЧИН САЙДЫН АЖИЛТАН ЗАМ ТЭЭВРИЙН ОСОЛ ХИЙЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/25     ЭНЭ ОНД НИЙСЛЭЛИЙН ХЭМЖЭЭНД 3000 ГАРУЙ НЭГЖ ТАЛБАРТ ГАЗАР ЧӨЛӨӨЛЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/25     “УЛААНБААТАР МЕТРО ТӨСӨЛ”-ИЙН ТЕНДЕРИЙН ХОЁРДУГААР ШАТНЫ ШАЛГАРУУЛАЛТ ЗАРЛАГДЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/24     2026-2028 ОНД ДУЛААНЫ ТАВДУГААР ЦАХИЛГААН СТАНЦЫГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР БАРИНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24     ХОГ ШАТААЖ, ЭРЧИМ ХҮЧ ГАРГАХ ҮЙЛДВЭРИЙН БАРИЛГА УГСРАЛТЫН АЖЛЫГ 2026 ОНД ЭХЛҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24    

China-funded overpass in Mongolia opens to traffic www.xinhuanet.com

ULAN BATOR, Sept. 16 (Xinhua) -- An overpass built with the Chinese government's soft loan near the Traffic Police Department of Mongolia in downtown Ulan Bator opened to traffic on Monday.

The construction of the 1,100-meter overpass, which started in April last year, was built by China Railway 20 Bureau Group Co., Ltd.

Witnesses at the opening ceremony include senior officials from China and Mongolia: the Chinese Ambassador to Mongolia Xing Haiming, Mongolian Prime Minister Ukhnaa Khurelsukh, Mongolian Minister of Road and Transport Development Byambasuren Enkh-Amgalan and Mayor of Mongolia's capital Ulan Bator Sainbuyan Amarsaikhan.

The Chinese ambassador expressed hope that the overpass can effectively reduce the interference of railways on municipal roads, reduce traffic congestion, facilitate travel for citizens, and play an important role in accelerating the modernization of Ulan Bator's road traffic.

For his part, the Mongolian prime minister expressed his sincere thanks to the Chinese side for the strong support and assistance to Mongolia's development.

"Ulan Bator was originally built with a plan to have 500,000 residents. Today, the city has become a big city home to around half of the country's population of 3.2 million," Khurelsukh said at the ceremony.

"As the city expands, the country has been suffering urban diseases, especially traffic jam. I am fully confident that the China-funded overpass can contribute significantly to reduce traffic congestion in the capital city," said Khurelsukh.

At the occasion, Xing said that the 2019 year marks the 70th anniversary of the establishment of China-Mongolia diplomatic relations, the 25th anniversary of the revision of the Treaty on Friendship and Cooperation between China and Mongolia, and the 5th anniversary of the establishment of a comprehensive strategic partnership.

This year, the pragmatic bilateral cooperation ushered in a bumper harvest, with a number of major cooperation projects completed, said Xing.

Since the beginning of this year, with Chinese non-refundable aid and soft loans, several such high-standard and modern facilities as a development center for disabled children, highways, overpasses and agricultural machinery have been handed over to the Mongolian side, reflecting the high level of pragmatic cooperation between the two countries, according to the ambassador.



Published Date:2019-09-17