1 PRIME MINISTER OF MONGOLIA HOLDS PHONE TALKS WITH PRIME MINISTER OF JAPAN WWW.MONTSAME.MN PUBLISHED:2026/10/29      2 MONGOLIAN MINING COMPANY SAYS COPPER EXPORTS HAVE DROPPED DUE TO CHINA BORDER RESTRICTIONS WWW.ABCNEWS.COM PUBLISHED:2026/10/29      3 NEW REPORT FINDS TRUMP JR.’S MONGOLIA TRIP WENT FAR BEYOND HUNTING WWW.MS.NOW PUBLISHED:2026/10/29      4 MONGOLIA SUSPENDS ROAD TRANSPORT ON KEY COAL CORRIDOR TO CHINA WWW.MYSTEEL.NET PUBLISHED:2026/10/29      5 E-MART OPENS 7TH STORE IN MONGOLIA, WITH 8TH SET FOR NOVEMBER WWW.EN.SEDAILY.COM PUBLISHED:2026/10/29      6 UN GENERAL ASSEMBLY FIRST COMMITTEE ADOPTS MONGOLIA’S RESOLUTION ON NUCLEAR-WEAPON-FREE STATUS WWW.MONTSAME.MN PUBLISHED:2026/10/29      7 MONGOLIA HARVESTS 88% OF AUTUMN CROPS WWW.MONTSAME.MN PUBLISHED:2026/10/29      8 KREMLIN-LINKED BUSINESSMAN JOINED DONALD TRUMP JR. ON MONGOLIAN HUNTING TRIP THIS SUMMER – FT WWW.THEMOSCOWTIMES.COM PUBLISHED:2026/10/28      9 MONGOLIA EYES A NON-PERMANENT SEAT ON THE UNSC – IN 2048 WWW.THEDIPLOMAT.COM PUBLISHED:2026/10/28      10 KOREA TO PILOT GROUP TOURIST VISAS FOR MONGOLIAN NATIONALS WWW.KOREAHERALD.COM PUBLISHED:2026/10/28      ОЮУТОЛГОЙН ГҮНИЙ УУРХАЙД ГАЗАР ХӨДЛӨЛТИЙН ШИНЖТЭЙ ҮЗЭГДЭЛ БОЛЖ 15 АЖИЛТАН БЭРТЖЭЭ WWW.IKON.MN НИЙТЭЛСЭН:2026/10/29     Г.ТЭМҮҮЛЭН: ОРОН СУУЦНЫ ЗАЛИЛАНГИЙН ХЭРГИЙГ 2027 ОНЫ ЭХНИЙ УЛИРАЛД БАГТААН ЭЦЭСЛЭН ШИЙДВЭРЛЭНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/10/29     З.МЭНДСАЙХАН: ГАШУУНСУХАЙТЫН ЦААД ТАЛЫН БООМТЫН ЗАСВАРААС БОЛЖ ОЮУТОЛГОЙН ЗЭСИЙН ЭКСПОРТ ГУРАВ ДАХИН БУУРААД БАЙНА WWW.IKON.MN НИЙТЭЛСЭН:2026/10/29     БНХАУ-ААС ӨНӨӨДРИЙН БАЙДЛААР 25,000 ОРЧИМ ТОНН ХАГАС КОКСОН ТҮЛШ ТАТАЖ АВЧЭЭ WWW.IKON.MN НИЙТЭЛСЭН:2026/10/29     ОЮУТОЛГОЙН НООГДОЛ АШИГ ₮857 МЯНГЫГ ДАНСАНДАА АВАХЫГ 77,587 ИРГЭН ДЭМЖИЖ ГАРЫН ҮСЭГ ЗУРЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/10/29     Н.УЧРАЛ, С.ТАКАИЧИ НАР НӨМРӨГИЙН ДАРХАН ЦААЗАТ ГАЗРЫН АСУУДЛААР УТСААР ЯРЬЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/10/29     ЯПОНЫ ЕРӨНХИЙ САЙД ТАКАИЧИ САНАЭ МОНГОЛ УЛСЫН ЕРӨНХИЙ САЙД Л.ОЮУН-ЭРДЭНЭТЭЙ УТСААР ЯРЬСАН ГЭЖ АНДУУРЧЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/10/29     ТӨСӨВ 2027: ГАНДАНГИЙН ДЭНЖИД 15 ТЭРБУМ, ХАРХОРУМД 5 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/10/28     ТӨРИЙН АЛБАН ХААГЧДЫН ДУНДАЖ ЦАЛИН 2.6 САЯ ТӨГРӨГТ ХҮРЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/10/28     ЗАСГИЙН ГАЗРЫН ХУРАЛДААНААС ГАРСАН ШИЙДВЭРҮҮД WWW.ITOIM.MN НИЙТЭЛСЭН:2026/10/28    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23