1 MONGOLIA'S FOREIGN TRADE TURNOVER RISES OVER 36 PCT IN H1 WWW.XINHUANET.COM PUBLISHED:2026/07/21      2 JADE GAS SECURES A$1BN FUNDING FOR COAL BED METHANE GAS, LNG DEVELOPMENT IN MONGOLIA WWW.MININGWEEKLY.COM PUBLISHED:2026/07/21      3 PRESIDENT OF TAJIKISTAN ARRIVES ON AN OFFICIAL STATE VISIT TO MONGOLIA WWW.TREND.AZ PUBLISHED:2026/07/21      4 FESTIVAL DIPLOMACY LESSONS FROM MONGOLIA'S NAADAM WWW.CHOSUN.COM PUBLISHED:2026/07/21      5 AI-92 GASOLINE PRICES INCREASE AS RUSSIAN IMPORT COSTS REACH USD 800 PER TON WWW.GOGO.MN PUBLISHED:2026/07/21      6 COP17 VENUE EXTERIOR WORKS REACH 90 PERCENT WWW.MONTSAME.MN PUBLISHED:2026/07/21      7 ISRAELI TOURISTS ATTACKED WITH AXES AND KNIVES BY MEN SHOUTING ‘HEIL HITLER’ AT MONGOLIA CAMPSITE WWW.COMBATANTISEMITISM.ORG PUBLISHED:2026/07/21      8 KOREA'S MONGOLIAN MINERAL BET MAY BECOME A GEOPOLITICAL TIGHTROPE WALK BETWEEN CHINA, RUSSIA AND THE U.S. WWW.KOREAJOONGANGDAILY.COM PUBLISHED:2026/07/20      9 PRESIDENT OF TAJIKISTAN TO PAY STATE VISIT TO MONGOLIA WWW.MONTSAME.MN PUBLISHED:2026/07/19      10 AI-92 GASOLINE PRICE RISES BY MNT 250 PER LITER FROM JULY 15 WWW.GOGO.MN PUBLISHED:2026/07/19      ХЯТАДЫН АРДЫН БАНКТАЙ БАЙГУУЛСАН СВОП ХЭЛЦЛИЙН ХУГАЦААГ 5 ДАХЬ УДААГАА СУНГАВ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/07/21     ТАЖИКИСТАН УЛСЫН ЕРӨНХИЙЛӨГЧ ТӨРИЙН АЙЛЧЛАЛ ХИЙХЭЭР ХҮРЭЛЦЭН ИРЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/07/21     ХЯТАДЫН C919 ОНГОЦ ОЛОН УЛСЫН НИСЛЭГЭЭ УЛААНБААТАРААС ЭХЛҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/07/21     НИЙСЛЭЛ, АЙМГИЙН УДИРДЛАГУУДЫН АЖЛЫГ ХҮНД СУРТЛЫГ БУУРУУЛЖ, ИРГЭД, АЖ АХУЙН НЭГЖИЙН АЧААГ ХЭРХЭН ХӨНГӨЛСНӨӨР ДҮГНЭНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/07/21     НААДМЫН АМРАЛТААР 11 ТОМ ХҮН, 2 ХҮҮХЭД УСАНД ОСОЛДОЖ, ЭНДЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/07/21     АҮЭБЯ:"БАДРАХ ЭНЕРЖИ"-ИЙН ЗӨВШӨӨРШЛИЙН АЖЛЫГ ЭРЧИМЖҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/07/21     ҮСХ: ЭКСПОРТ ӨМНӨХ ОНЫ МӨН ҮЕЭС 57.9 ХУВИАР ӨСЛӨӨ WWW.NEWS.MN НИЙТЭЛСЭН:2026/07/21     2030 ОН ГЭХЭД ГАЗАР НУТГИЙНХАА 30 ХУВИЙГ ХАМГААЛАЛТАД АВНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/07/20     МАЦУМОТО-ДАЛАНЗАДГАД ЧИГЛЭЛИЙН АНХНЫ ОЛОН УЛСЫН НИСЛЭГЭЭР ЯПОНЫ 80 ГАРУЙ ЖУУЛЧИН ИРЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/07/19     ТАЖИКИСТАН УЛСЫН ЕРӨНХИЙЛӨГЧ ТӨРИЙН АЙЛЧЛАЛ ХИЙНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/07/19    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23