1 THE BRITISH AMBASSADOR VISITED THE BRITISH BUSINESS CENTRE WWW.MONGOLIANBUSINESSDATABASE.COM PUBLISHED:2026/02/13      2 URANIUM NEO-COLONIALISM IN MONGOLIA: CRIME BUT NO PUNISHMENT WWW.FPIF.ORG PUBLISHED:2026/02/13      3 FOREIGN MINISTER BATTSETSEG MEETS US SECRETARY OF STATE MARCO RUBIO WWW.MONTSAME.MN PUBLISHED:2026/02/13      4 KH.NYAMBAATAR: 50,000 HOUSEHOLDS WILL SWITCH TO GAS NEXT YEAR WWW.GOGO.MN PUBLISHED:2026/02/13      5 MONGOLIA, CHINA HOLD STRATEGIC DIALOGUE WWW.MONTSAME.MN PUBLISHED:2026/02/13      6 TİKA-BACKED PROJECT ESTABLISHES PEDIATRIC BONE MARROW TRANSPLANT CAPACITY IN MONGOLIA WWW.AZERNEWS.AZ PUBLISHED:2026/02/13      7 COLD WINTER KILLS 26,300 HEAD OF LIVESTOCK IN MONGOLIA WWW.XINHUANET.COM PUBLISHED:2026/02/13      8 CAPITAL CITY AUTHORIZED TO ISSUE BONDS FOR CHP PLANT NO.5 PROJECT FINANCING WWW.MONTSAME.MN PUBLISHED:2026/02/12      9 GL EVENTS SELECTED AS GENERAL CONTRACTOR FOR COP17 TEMPORARY FACILITIES WWW.MONTSAME.MN PUBLISHED:2026/02/12      10 LOCAL AUTHORITIES GRANTED LAND ALLOCATION POWERS WWW.MONTSAME.MN PUBLISHED:2026/02/12      БРИТАНИ УЛСЫН ЭЛЧИН САЙД BRITISH BUSINESS CENTRE-Д ЗОЧИЛЛОО WWW.MONGOLIANBUSINESSDATABASE.COM НИЙТЭЛСЭН:2026/02/13     "ЭРДЭНЭС ТАВАНТОЛГОЙ" ХК-ИЙН УУРХАЙН НҮҮРС АЧИЛТЫН ХЭМЖЭЭ 5 САЯ ТОННЫГ ДАВЛАА WWW.GOGO.MN НИЙТЭЛСЭН:2026/02/13     ОЮУТОЛГОЙН ХӨРӨНГӨ ОРУУЛАГЧИДТАЙ ХИЙЖ БУЙ ХЭЛЭЛЦЭЭРИЙГ ОНЫ ЭХНИЙ ХАГАСТ ЭЦЭСЛЭХЭЭР ТӨЛӨВЛӨЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/13     БОР-ӨНДӨР – АЙРАГ ӨРТӨӨ ХООРОНД 54 КМ ШИЛЭН КАБЕЛЬ ТАВИЛАА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/13     ТАМИРЧДААСАА ОЛОН БҮРЭЛДЭХҮҮНТЭЙ АЛБАНЫХНЫ ЗАРДЛЫГ ХЭН, ХААНААС ГАРГАСАН БЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/13     “СМАРТ ЭКО ТРАНС” ХХК-Д ДАВУУ ЭРХ ОЛГОСОН АСУУДЛЫГ АТГ, УЕП, ЦЕГ-Т ШИЛЖҮҮЛЭВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/13     "ЕВРАЗИЙН ЭДИЙН ЗАСГИЙН ТҮР ХЭЛЭЛЦЭЭ АШИГТАЙ БАЙВАЛ 3 ЖИЛИЙН ДАРАА СУНГАНА" WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/13     7.9 ТЭРБУМ ТӨГРӨГТЭЙ ТЭНЦЭХ ХЭМЖЭЭНИЙ ЮАНЬ, АМ.ДОЛЛАРЫГ ХУУРАМЧААР ХЭВЛЭН ИРГЭДИЙГ ЗАЛИЛЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/12     “ПАКИСТАН-МОНГОЛЫН B2B БИЗНЕС ЧУУЛГАН” & НИМАВА (УЛААНЫ ШАШИН) УРСГАЛЫН ӨВ СОЁЛЫН АЯЛАЛ ХӨТӨЛБӨР WWW.MONGOLIANBUSINESSDATABASE.COM НИЙТЭЛСЭН:2026/02/12     ХИЛИЙН БҮС ДЭХ АСАР ТОМ ГАЗРЫН ХУЛГАЙ ИЛРЭВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/12    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23