1 RUSSIA PROPOSES NUCLEAR POWER PLANT & URANIUM MINING PROJECTS FOR MONGOLIA WWW.RUSSIASPIVOTTOASIA.COM PUBLISHED:2026/01/04      2 HUNNU CITY AS AN URBAN CONSTELLATION FOR MONGOLIA’S 2050 VISION WWW.PARAMETRIC-ARCHITECTURE.COM PUBLISHED:2026/01/04      3 MONGOLIA'S CENTRAL BANK PURCHASES 16.3 TONS OF GOLD IN 2025 WWW.XINHUANET.COM PUBLISHED:2026/01/03      4 MONGOLIA'S FOREX RESERVES REACH RECORD HIGH IN 2025 WWW.XINHUANET.COM PUBLISHED:2026/01/03      5 MONGOLIA LEADS WORLD RANKINGS IN MEMORY, MIND SPORTS WWW.MONTSAME.MN PUBLISHED:2026/01/03      6 MONGOLIA EXTENDS VISA EXEMPTION POLICY FOR 34 COUNTRIES BY ONE YEAR WWW.VISASNEWS.COM PUBLISHED:2026/01/02      7 MONGOLIA AND CHINA HAVE ERECTED MORE THAN 4.700 KILOMETERS OF BORDER FENCES TO CONTAIN LIVESTOCK, CURB PASTURE DEGRADATION, AND TRANSFORM THE GRASSLAND INTO A PERMANENT ECOLOGICAL BORDER OF TERRITORIAL SOVEREIGNTY WWW.EN.CLICKPETROLEOEGAS.COM.BR  PUBLISHED:2026/01/02      8 CHINA TIGHTENS EXPORT CONTROLS ON SILVER, STEEL, ANTIMONY WWW.CHOSUN.COM PUBLISHED:2026/01/02      9 MAYOR REPORTS ON CONSTRUCTION PROJECTS TO BE IMPLEMENTED IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/01/02      10 AI CAMERAS BEGIN DETECTING TRAFFIC VIOLATIONS, ISSUING FINES WWW.MONTSAME.MN PUBLISHED:2026/01/02      МОНГОЛБАНК 16.3 ТОНН ҮНЭТ МЕТАЛЛ ХУДАЛДАН АВЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/03     МОНГОЛЫН АГААРЫН ТЭЭВРИЙН ШИНЭ ҮЕ: 2026 ОНД АЗИ, ЕВРОП, ХОЙД АМЕРИК РУУ ШИНЭ ЧИГЛЭЛҮҮД НЭЭНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/03     58.1 САЯ ТОЛГОЙ МАЛ ТООЛОГДЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/03     ШЕЗ-ИЙН ДАРГААР П.ЗОЛЗАЯАГ СОНГОЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/03     ТУУЛЫН ХУРДНЫ ЗАМЫН БҮТЭЭН БАЙГУУЛАЛТЫН БАРИЛГЫН АЖЛЫГ ГУРАВДУГААР САРД ЭХЛҮҮЛНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/03     ШАРХАД, БАЯНХОШУУНД ТУС БҮР 110 АЙЛЫН НОГООН ОРОН СУУЦЫГ АШИГЛАЛТАД ОРУУЛЛАА WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/02     МИЛЛЕР: “СИБИРИЙН ХҮЧ–2” ХИЙН ХООЛОЙН ТӨСЛИЙГ ХУГАЦААНААС НЬ ӨМНӨ АШИГЛАЛТАД ОРУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/02     ТӨСӨЛ: ЖИЛИЙН 400 САЯ ТӨГРӨГ ХҮРТЭЛХ БОРЛУУЛАЛТЫН ОРЛОГОТОЙ БОЛ НӨАТ-ЫГ ХЯЛБАРШУУЛСАН ГОРИМООР ТАЙЛАГНАДАГ БОЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/02     МОНГОЛ УЛС АЯЛАЛ ЖУУЛЧЛАЛЫН СЭРГЭЛТИЙН ҮЗҮҮЛЭЛТЭЭР ДЭЛХИЙН ШИЛДЭГ 20 УЛСЫН ТООНД БАГТЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/02     ОЙ ТОГТООЛТЫН СПОРТЫН ДЭЛХИЙН ЧАНСААГ МОНГОЛЫН ТАМИРЧИД ТЭРГҮҮЛЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/02    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23