1 DRAFT 2027 BUDGET FOR ULAANBAATAR SUBMITTED WWW.MONTSAME.MN PUBLISHED:2026/11/22      2 MONGOLIA EXPRESSES GOAL TO LAUNCH DIRECT FLIGHTS WITH THE UNITED STATES IN 2028 WWW.MONTSAME.MN PUBLISHED:2026/11/22      3 MONGOLIAN PRESIDENT'S RESIGNATION SETS STAGE FOR EARLY ELECTION WWW.REUTERS.COM PUBLISHED:2026/11/21      4 CHINA-MONGOLIA-RUSSIA PASSENGER TRAIN SERVICE TO BE LAUNCHED SOON WWW.XINHUANET.COM PUBLISHED:2026/11/21      5 55 MONGOLIAN STUDENTS RECEIVE OUTSTANDING CAMBRIDGE LEARNER AWARDS WWW.MONTSAME.MN PUBLISHED:2026/11/21      6 MONGOLIA RANKS 42ND GLOBALLY IN E-GOVERNMENT DEVELOPMENT INDEX WWW.MONTSAME.MN PUBLISHED:2026/11/21      7 GOVERNMENT PROPOSES REMOTE ONLINE NOTARY SERVICES, FEE EXEMPTIONS FOR VULNERABLE GROUPS WWW.MONTSAME.MN PUBLISHED:2026/11/21      8 AS KHURELSUKH STEPS DOWN, CHAIRMAN BYAMBATSOGT WILL EXERCISE PRESIDENTIAL POWERS WWW.MONTSAME.MN PUBLISHED:2026/11/19      9 MONGOLIA INFLATION HITS 13.4% AS MINING GROWTH OUTPACES HOUSEHOLD INCOME WWW.EBC.COM PUBLISHED:2026/11/19      10 STARLINK DIRECT-TO-CELL GOES LIVE IN MONGOLIA VIA MOBICOM WWW.BASENOR.COM PUBLISHED:2026/11/19      ИРЭХ ОНД НИЙСЛЭЛ 4.6 ИХ НАЯД ТӨГРӨГИЙН ТӨСӨВ ЗАРЦУУЛНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/11/22     ОХУ-ЫН ЕРӨНХИЙЛӨГЧ В.ПУТИН: МОНГОЛЧУУД ТУЛАЛДАЖ, ТУЛАЛДАЖ МОНГОЛ-ХЯТАДЫН ЭЗЭНТ ГҮРНИЙГ БАЙГУУЛСАН Ч ЭЦЭСТ НЬ УУССАН WWW.IKON.MN НИЙТЭЛСЭН:2026/11/22     МОНГОЛ, АНУ-ЫН ХООРОНД 2028 ОНД ШУУД НИСЛЭГ ҮЙЛДЭХ ЗОРИЛГОТОЙГОО ИЛЭРХИЙЛЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/22     ИРЭХ ОНД 142 СУРГУУЛЬ, 72 ЦЭЦЭРЛЭГ, 39 ДОТУУР БАЙР БАРИНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/21     МОНГОЛД “РИО ТИНТО” ГРУППИЙН БАГ ИРНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/11/21     ПРОКУРОР АСАН Э.АМАРБАТ НАРЫН ХЭРГИЙГ УДШ-ЭЭР ХЭЛЭЛЦҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/11/21     МОНГОЛ, ОРОСЫН ЭРДЭМТЭД “ЭГИЙН ГОЛЫН УЦС” ТӨСЛИЙГ ХЭРЭГЖҮҮЛЭХ БОЛОМЖТОЙ ГЭЖ ДҮГНЭВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/21     МОНГОЛ УЛСЫН ЕРӨНХИЙЛӨГЧ У.ХҮРЭЛСҮХИЙГ ҮҮРЭГТ АЖЛААС НЬ ЧӨЛӨӨЛЛӨӨ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/19     Г.ТЭМҮҮЛЭН: ХАР ТАМХИТАЙ ХОЛБООТОЙ ГЭМТ ХЭРЭГТ ТӨРИЙН АЛБАН ХААГЧ ЗУРГААН ХҮН ХОЛБОГДСОНЫГ ШАЛГАЖ БАЙНА WWW.IKON.MN НИЙТЭЛСЭН:2026/11/19     Ш.АЛТАНТУЯА АГСНЫ ААВ С.ШААРИЙБУУ ГУАЙН ЦУГЛУУЛЖ БУЙ ГАРЫН ҮСЭГ 100 МЯНГА ХҮРЛЭЭ НИЙТЭЛСЭН:2026/11/19    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23