1 GOVERNMENT TO LIBERALIZE ENERGY PRICES BY END OF YEAR WWW.GOGO.MN PUBLISHED:2026/03/25      2 MONGOLIA’S MEAT EXPORTS TO MIDDLE EAST REACH USD 60 MILLION WWW.GOGO.MN PUBLISHED:2026/03/25      3 NO DISRUPTIONS IN FUEL SUPPLY; DOMESTIC RESERVES AT NORMAL LEVELS WWW.MONTSAME.MN PUBLISHED:2026/03/25      4 S. KOREA, MONGOLIA DISCUSS ACCELERATING ECONOMIC PARTNERSHIP NEGOTIATIONS WWW.ENGLISH.KYODONEWS.NET PUBLISHED:2026/03/25      5 SOUTH KOREA CHANGES KOREAN SPELLING OF MONGOLIAN CAPITAL TO RESPECT LOCAL PRONUNCIATION WWW.EN.SEDAILY.COM PUBLISHED:2026/03/25      6 FROM FORECASTS TO FORESIGHT: STRENGTHENING MONGOLIA’S CLIMATE INTELLIGENCE THROUGH PARTNERSHIP WWW.UNDP.ORG PUBLISHED:2026/03/25      7 MONGOLIA WANTS TO INCREASE IMPORTS OF OIL, PETROLEUM PRODUCTS FROM KAZAKHSTAN WWW.INTERFAX.COM PUBLISHED:2026/03/24      8 CHAIRMAN UCHRAL HOLDS TALKS WITH CHAIRMAN ZHAO LEJI WWW.MONTSAME.MN PUBLISHED:2026/03/24      9 MONGOLIA-UK ROUNDTABLE MEETING HELD WWW.MONTSAME.MN PUBLISHED:2026/03/24      10 RESIDENTS OF UVS PROVINCE EXPRESS SUPPORT FOR BILL TO RECALL PARLIAMENT MEMBERS WWW.GOGO.MN PUBLISHED:2026/03/24      ГАДААДЫН ШУУД ХӨРӨНГӨ ОРУУЛАЛТЫН 35 ХУВИЙГ “ОЮУ ТОЛГОЙ” ХИЙЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/25     "ДИЗЕЛЬ ТҮЛШНИЙ ҮНИЙГ 300 ТӨГРӨГӨӨР НЭМЭХЭЭР БОЛЛОО" WWW.NEWS.MN НИЙТЭЛСЭН:2026/03/25     Д.БАЯСГАЛАН: ЕРӨНХИЙ САЙД АСАН Л.ОЮУН-ЭРДЭНИЙН ХЭЛСЭН БҮХЭН ОР ҮНДЭСГҮЙ, БОЛОМЖГҮЙ ЗҮЙЛС WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/25     ТӨРИЙН ОРОН СУУЦЫГ ИРГЭДЭД ХӨЛСЛҮҮЛЭХ, ӨМЧЛҮҮЛЭХ, БОРЛУУЛАХ ШИНЭЧИЛСЭН ЖУРАМ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/25     Ж.ЭНХБАЯР: КОРОНАВИРУСТ ЦАР ТАХЛЫН ҮЕД ХЭРЭГЖҮҮЛСЭНТЭЙ АДИЛ ДАЙНЫ ХУУЛИЙН ТӨСЛИЙГ ӨРГӨН МЭДҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/24     МАН-ЫН ДАРГА Н.УЧРАЛ ХКН-ЫН ТӨВ ХОРООНЫ УЛС ТӨРИЙН ТОВЧООНЫ БАЙНГЫН ХОРООНЫ ГИШҮҮН ЦАЙ ЧИТАЙ УУЛЗАВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/24     Ж.ЭНХБАЯР: ШАТАХУУНЫ ҮНЭ 20 ХУВИАР НЭМЭГДЭХЭД ИНФЛЯЦ НЭГ ХУВИАР ӨСӨХ МАГАДЛАЛТАЙ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/24     “АЗИЙН АВТО ЗАМЫН СҮЛЖЭЭГЭЭР ОЛОН УЛСЫН АВТОТЭЭВЭРЛЭЛТ ГҮЙЦЭТГЭХ ТУХАЙ” ХЭЛЭЛЦЭЭРТ БЭЛТГЭЖ БАЙНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/24     БОРТЭЭГИЙН ОРДОД ХӨРӨНГӨ ОРУУЛАЛТ ХИЙЖ ХАМТРАН АЖИЛЛАХААР 7 АЖ АХУЙН НЭГЖ, КОНСОРЦИУМ САНАЛ ИРҮҮЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/24     "ОЙРХ ДОРНОДЫН АСУУДЛААС ҮҮДЭЖ ДИЗЕЛЬ ТҮЛШ, ШАТАХУУНЫ ҮНЭ НЭМЭГДЭХ ЭРСДЭЛ ҮҮСЭЖ БАЙНА" WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23