1 RUSSIA PLEDGES UNINTERRUPTED FUEL SUPPLIES TO MONGOLIA FOR 2026 WWW.GOGO.MN PUBLISHED:2026/01/21      2 MALAYSIA WINS APPEAL IN LAWSUIT BY FAMILY OF MURDERED MONGOLIAN WOMAN ALTANTUYA WWW.BLOOMBERG.COM PUBLISHED:2026/01/21      3 SOCIAL PROTECTIONS OVERLOOKED IN MONGOLIA–UK CRITICAL MINERALS COOPERATION WWW.EASTASIAFORUM.ORG  PUBLISHED:2026/01/21      4 PRIME MINISTER MEETS ITU SECRETARY-GENERAL IN DAVOS WWW.MONTSAME.MN PUBLISHED:2026/01/21      5 RIO TINTO REPORTS HIGHER Q4 COPPER OUTPUT AS HUGE MONGOLIAN MINE RAMPS UP WWW.SEEKINGALPHA.COM PUBLISHED:2026/01/21      6 NCT WISH HEADS TO MONGOLIA IN NEW TRAVEL VARIETY 'ON THE MAP,' PREMIERING TODAY WWW.ALLKPOP.COM PUBLISHED:2026/01/21      7 TUGRUG WEAKENS AGAINST EURO, RUBLE, AND YUAN ON MONTHLY AVERAGE WWW.MONTSAME.MN PUBLISHED:2026/01/21      8 MONGOLIA’S COAL: RECORD VOLUMES, TOUGH PRICES — 2025 REVIEW & 2026 OUTLOOK WWW.CAPITALMARKETS.MN PUBLISHED:2026/01/20      9 EXPORTS OF COMBED CASHMERE REACH USD 330 MILLION UNDER THE 'WHITE GOLD”' MOVEMENT WWW.MONTSAME.MN PUBLISHED:2026/01/20      10 LOCAL LEADERS AGREE ON DECENTRALIZATION AND REFORM PRIORITIES FOR 2026 WWW.UBPOST.MN PUBLISHED:2026/01/20      ЦАХИЛГААНЫ ХЯЗГААРЛАЛТ ӨНӨӨДӨР ҮРГЭЛЖИЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/21     ХҮННҮ ХОТ ТӨСЛИЙН ЦЭВЭРЛЭХ БАЙГУУЛАМЖИЙН БАРИЛГЫН АЖИЛ 10 ХУВЬТАЙ ҮРГЭЛЖИЛЖ БАЙНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/21     МОНГОЛООСОО ДҮРВЭГСДИЙН ПАРАДОКС WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/21     П.БОЛДБААТАР: 43 ЖИЛ "ДЦС-4"-Т БҮРЭН ШИНЭЧЛЭЛ ХИЙГДЭЭГҮЙ, НЭГ ЗУУХ НЭМЭХ ГЭЭД 2018 ОНООС ХОЙШ ЯВЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/21     RIO TINTO, GLENCORE НЭГДЭХ ХЭЛЦЭЛ ИД ӨРНӨЖ БАЙХАД “ОЮУ ТОЛГОЙ”-Г ХЯТАД СОНИРХСООР БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/21     ХУУЛЬ ТӨРӨХИЙН ӨМНӨ: ТӨР УХАРЧ, ЗАХ ЗЭЭЛ УРАГШЛАХ УУ? WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/21     “ЧИНГИС ХААН” ҮНДЭСНИЙ МУЗЕЙ ОЛОН УЛСЫН ӨВИЙН ХҮРЭЭЛЭНТЭЙ ХАМТАРНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/21     С.ШААРИЙБУУГИЙН ЭСРЭГ ДАВЖ ЗААЛДСАН МАЛАЙЗЫН ЗАСГИЙН ГАЗАР ЯЛАЛТ БАЙГУУЛЖ, ХОЛБООНЫ ШҮҮХЭД ХАНДАХ НАЙДВАР ҮЛДЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/20     НЕОСИТИ ХОТХОН ДУЛААН ХАНГАМЖАА БИЕ ДААСАН ЭХ ҮҮСВЭРЭЭС ШИЙДЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/20     2026 ОНД АЯЛАХ ОРНУУДЫН ЖАГСААЛТАД МОНГОЛ УЛС НЭРЛЭГДСЭЭР БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/20    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23