1 MONGOLIA, RUSSIA, CHINA HOLD TRILATERAL CONSULTATIVE MEETING WWW.MONTSAME.MN PUBLISHED:2026/07/03      2 MONGOLIAN STATE BUDGET RECORDED ALMOST USD280 MILLION DEFICIT IN 2025 WWW.ASIANEWS.NETWORK PUBLISHED:2026/07/03      3 JAPAN, CHINA VIE FOR MONGOLIA'S RARE EARTH RESOURCES WWW.CHOSUN.COM PUBLISHED:2026/07/02      4 JAPAN, MONGOLIA AGREE TO SHARE PORTION OF GREENHOUSE GAS EMISSION REDUCTIONS ACHIEVED THROUGH DECARBONIZATION TECHNOLOGIES WWW.JAPANNEWS.YOMIURI.CO.JP PUBLISHED:2026/07/02      5 MENDSAIKHAN ZAGDJAV: AGREEMENT REACHED TO REDUCE SHAREHOLDER LOAN INTEREST RATE AFTER FIVE ROUNDS OF NEGOTIATIONS WWW.MONTSAME.MN PUBLISHED:2026/07/02      6 TAX SUPPORT TO BE PROVIDED TO LEGAL ENTITIES REGISTERED IN VIRTUAL ZONE WWW.MONTSAME.MN PUBLISHED:2026/07/02      7 MONGOLIA ENERGY WORKERS DELAY STRIKE FOR TALKS WWW.SXCOAL.COM PUBLISHED:2026/07/02      8 RIO TINTO AGREES NEW FINANCIAL TERMS FOR $18BN COPPER MINE PROJECT WWW.FT.COM PUBLISHED:2026/07/01      9 RIO TINTO'S OYU TOLGOI RESET: MONGOLIA PUSHES FOR A BIGGER SHARE OF ITS MINING WEALTH WWW.CAPITALMARKETS.MN PUBLISHED:2026/07/01      10 PRIME MINISTER UCHRAL: GOVERNMENT ACHIEVES HISTORIC BREAKTHROUGH IN OYU TOLGOI NEGOTIATIONS WWW.MONTSAME.MN PUBLISHED:2026/07/01      280,000 ТОНН ХАГАС КОКСОН ТҮЛШИЙГ ГАДААДААС ХУДАЛДАЖ АВНА WWW.CNBC.MN НИЙТЭЛСЭН:2026/07/03     МОНГОЛ УЛС, ОХУ, БНХАУ-ЫН ЗӨВЛӨЛДӨХ УУЛЗАЛТ БОЛОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/07/03     ГАЗАР АВАХ ХҮСЭЛТИЙГ ЦАХИМААР ИРҮҮЛСЭН ДАРААЛЛААР НЬ ШИЙДВЭРЛЭЖ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/07/03     ГАЛБЫН ГОВИЙГ ДЭЛХИЙД ШИНЭЭР ТАНИУЛАХ “ХАНБОГД-ШАР ЦАВ” ГЕОПАРКИЙГ НЭЭЛЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/07/02     Э.АНАРЫГ ТӨВ БАНКНЫ ТЭРГҮҮН ДЭД ЕРӨНХИЙЛӨГЧӨӨР ТОМИЛЛОО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/07/02     ГОЛОМТ БАНК АЗИЙН ХӨГЖЛИЙН БАНКНААС 64 САЯ АМ.ДОЛЛАРЫН САНХҮҮЖИЛТ АВЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/07/02     НИЙГМИЙН ДААТГАЛЫН БАГЦ ХУУЛЬД НЭМЭЛТ, ӨӨРЧЛӨЛТ ОРУУЛАХ ТУХАЙ ХУУЛИЙГ БАТАЛЛАА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/07/02     С.АМАРСАЙХАН: МОНГОЛ, БНСУ ЖОЛООНЫ ҮНЭМЛЭХЭЭ ХАРИЛЦАН ХҮЛЭЭН ЗӨВШӨӨРДӨГ БОЛНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/07/02     З.МЭНДСАЙХАН: ЗАСГИЙН ГАЗАР ХЭЛЭЛЦЭЭРЭЭР "РИО ТИНТО"-ИЙН ӨМНӨ ҮҮРЭГ ХҮЛЭЭГЭЭГҮЙ. ӨГӨӨЖИЙГ 53 ХУВЬ БОЛГОЖ БАЙЖ ОНТРЭ ХЭЛЭЛЦЭЭР РҮҮ ОРНО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/07/02     НОТАРИАТЫН ҮЙЛЧИЛГЭЭГ 100 ХУВЬ ЦАХИМД ШИЛЖҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/07/01    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23