1 MONGOLIA JOINS THE PEACE COUNCIL INITIATED BY PRESIDENT DONALD TRUMP WWW.MONTSAME.MN PUBLISHED:2026/01/23      2 DAVOS 2026: TRUMP SIGNED HIS GAZA ‘BOARD OF PEACE’ INTO BEING. HERE’S WHO’S ON IT — AND WHO ISN’T WWW.CNBC.COM PUBLISHED:2026/01/23      3 PM ZANDANSHATAR MEETS FORMER UK PM TONY BLAIR WWW.MONTSAME.MN PUBLISHED:2026/01/23      4 TUUL WATER COMPLEX PROJECT TO ENABLE STORAGE OF 50 MLN CUBIC METERS OF WATER WWW.MONTSAME.MN PUBLISHED:2026/01/22      5 SECURITIES WORTH 8.8 TRILLION MNT TRADED OVER 35 YEARS WWW.UBPOST.MN PUBLISHED:2026/01/22      6 DOES A CITY OF 1.6 MILLION REALLY NEED ANOTHER SPORTS COMPLEX? WWW.UBPOST.MN PUBLISHED:2026/01/22      7 DAMAGE TO TPP-4’S EIGHTH BOILER REPAIRED WWW.GOGO.MN PUBLISHED:2026/01/22      8 BUSINESS & HERITAGE PROGRAM IN PAKISTAN MARCH 30- APRIL 05. 2026 WWW.MONGOLIANBUSINESSDATABASE.COM PUBLISHED:2026/01/22      9 GENERAL GOVERNMENT REVENUE AND GRANTS INCREASE BY MNT 1.2 TRILLION WWW.MONTSAME.MN PUBLISHED:2026/01/22      10 MONGOLIA'S INDUSTRIAL OUTPUT INCREASES 4.8 PCT IN 2025 WWW.XINHUANET.COM PUBLISHED:2026/01/22      ТОЙМ: Г.ЗАНДАНШАТАРЫН ДАВОС ДАХЬ АЙЛЧЛАЛЫН ҮЕЭР 2026 ОНД МОНГОЛД ТУЛГАРАХ ЭРСДЛИЙГ ЗАРЛАВ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/24     ЭНЭ ОНД 78.5 КМ УРТ ДУГУЙН ЗАМ БАРИХААР ТӨЛӨВЛӨЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/24     УЛСЫН АРСЛАН Б.ОРХОНБАЯР, Э.БАТМАГНАЙ НАР ХАЛЗ БАРИЛДААН ХИЙНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/24     УЛААНБААТАРТ 15 МЯНГАН ӨРХ ТОЛГОЙЛСОН ЭЦЭГ ЭХ, АМЬДАРЧ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/24     ШҮҮХ: Э.ГАН-ЭРДЭНЭ, Э.НОМИН-ЭРДЭНЭ, Х.ЭНХСАЙХАН НАРЫГ ЦАГААТГАЖ, ХОЁР ХҮНИЙ АМЬ НАСЫГ ХӨНӨӨСӨН Ц.ДАГВАДОРЖИД БҮХ НАСААР ХОРИХ ЯЛ ОНООЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/24     НӨАТ-ЫН БУЦААН ОЛГОЛТ ИРЭХ ДОЛОО ХОНОГТ ИРГЭДИЙН ДАНСАНД ОРНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/23     МОНГОЛ УЛС АНУ-ЫН ЕРӨНХИЙЛӨГЧ ДОНАЛД ТРАМПЫН САНААЧИЛСАН "ЭНХИЙН ЗӨВЛӨЛ"-Д АЛБАН ЁСООР НЭГДЭЖ, ҮҮСГЭН БАЙГУУЛАГЧ ГИШҮҮН УЛС БОЛОВ WWW.ITOIM.MN  НИЙТЭЛСЭН:2026/01/23     ЕРӨНХИЙ САЙД Г.ЗАНДАНШАТАРЫН НЭГДЭЭД БУЙ ТРАМПЫН “ЭНХИЙН ЗӨВЛӨЛ” ГЭЖ ЮУ ВЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/23     ЦЭРГИЙН ОНЦ БАЙДАЛ ЗАРЛАХЫН ӨМНӨ ХОЁР ТАГНУУЛЫН АЖИЛТНЫГ МОНГОЛ РУУ ИЛГЭЭСЭН НЬ ЮН СОК ЁЛТОЙ ХОЛБООТОЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/23     ЕРӨНХИЙ САЙД Г.ЗАНДАНШАТАР БРИТАНИЙН ЕРӨНХИЙ САЙД АСАН ТОНИ БЛЭЙР НАР УУЛЗАВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/22    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23