1 MONGOLIA RIO TINTO COPPER PARTNERSHIP RENEGOTIATION DEVELOPMENTS WWW.DISCOVERYALERT.COM.AU PUBLISHED:2026/03/11      2 91 CITIZENS RETURNED TO MONGOLIA ON SPECIAL MISSION FLIGHT WWW.GOGO.MN PUBLISHED:2026/03/11      3 MONGOLIAN FOREIGN MINISTER ATTENDS NUCLEAR ENERGY SUMMIT WWW.MONTSAME.MN PUBLISHED:2026/03/11      4 PUBLIC SERVICE REFERENCE DOCUMENTS NOW AVAILABLE IN SIX LANGUAGES WWW.MONTSAME.MN PUBLISHED:2026/03/11      5 MAJOR GENERAL ERDENEBAT PRAISED FOR STRENGTHENING MONGOLIA’S GLOBAL REPUTATION WWW.MONTSAME.MN PUBLISHED:2026/03/11      6 RIO TINTO SHARES HOLD SUPPORT: RENEGOTIATING COPPER MINE DEAL WWW.THEBULL.COM.AU PUBLISHED:2026/03/11      7 OVER 5,000 HOUSEHOLDS AT RISK FROM SNOWMELT FLOODS WWW.MONTSAME.MN PUBLISHED:2026/03/11      8 PRIME MINISTER RAISES DEMANDS ON OYU TOLGOI PROJECT IN MEETING WITH RIO TINTO WWW.MONTSAME.MN PUBLISHED:2026/03/10      9 DISCUSSION ON FORESTS, WATER AND RANGELANDS TO BE HELD AHEAD OF COP17 IN MONGOLIA WWW.MONTSAME.MN PUBLISHED:2026/03/10      10 RIO TINTO HELPED REMAKE THE MONGOLIAN ECONOMY. NOW, THE COUNTRY IS PUTTING ITS HAND OUT FOR MORE (OPINION) WWW.THENIGHTLY.COM.AU PUBLISHED:2026/03/10      ӨДӨРТ ДУНДЖААР 330,000 ТОНН НҮҮРС ЭКСПОРТОЛЖ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/03/11     ЗУРГААДУГААР САРЫН 1-ЭЭС ӨМНӨ ТЕНДЕР ЗАРЛАХГҮЙ БОЛ САНХҮҮЖИЛТИЙГ БУЦААН ТАТНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/11     ХЭРГИЙН МӨРӨӨР: Д.АМАРБАЯСГАЛАН "ҮНДЭСЛЭЛГҮЙГЭЭР ХӨРӨНГӨЖИХ" ЗҮЙЛ АНГИА ХАСУУЛЖ, ЭЦА, АТГ-Т 4 ХЭРГЭЭР ШАЛГУУЛЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/11     МОНГОЛЫН 91 ИРГЭНИЙГ ДАЙНЫ ЭРСДЭЛТЭЙ БҮСЭЭС ТАТАН АВЧИРЛАА WWW.NEWS.MN НИЙТЭЛСЭН:2026/03/11     ХОЁРДУГААР САРД ГАДААДЫН 776 ИРГЭНД МОНГОЛД ОРШИН СУУХ ЗӨВШӨӨРӨЛ ОЛГОЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/10     ГАДААД ХУДАЛДААНЫ БАЛАНС ЭЕРЭГ ГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/10     ХЭРГИЙН МӨРӨӨР: Б.БААТАРЫГ ТЕГ, ЭЦА, АТГ-ААС 12 ХҮРТЭЛХ ЖИЛИЙН ХОРИХ ЯЛТАЙ ДОЛООН ЗҮЙЛ АНГИАР ШАЛГАЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/10     ЭНЭ ОНД НИЙСЛЭЛИЙН ХЭМЖЭЭНД ДАРААХ 13 БАЙРШИЛД 52 КМ АВТО ЗАМ ШИНЭЭР БАРИНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/10     Н.АЛТАНХУЯГИЙГ ГУРВАН УДАА ЦАГААТГАСАН ШИЙДВЭРИЙГ ДАВЖ ЗААЛДАХ ШАТНЫ ШҮҮХЭЭС ХҮЧИНГҮЙ БОЛГОЛОО WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/10     “ОЮУ ТОЛГОЙ” ТӨСЛИЙН МОНГОЛД НОГДОХ ӨГӨӨЖИЙГ 60 ХУВИАС НЭМЭГДҮҮЛЭХ, 2026 ОНД БАГТААН НОГДОЛ АШИГ ОЛГОХ ШААРДЛАГА ТАВИЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/10    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23