1 MONGOLIA’S MEGA-AIRPORT UPGRADE: TURNING ULAANBAATAR INTO A SILK ROAD SKY HUB WWW.TRAVELRADAR.AERO PUBLISHED:2025/11/28      2 EBRD ANNOUNCES SETTLEMENT WITH MONGOLIAN COMPANIES MAX IMPEX AND KHAN ALTAI WWW.EBRD.COM PUBLISHED:2025/11/28      3 ULAANBAATAR TARGETS 50 PERCENT WASTE RECYCLING BY 2040 WWW.MONTSAME.MN PUBLISHED:2025/11/28      4 MAYOR NYAMBAATAR: ‘CONSTRUCTION OF TUUL HIGHWAY TO BEGIN IN MARCH 2026’ WWW.MONTSAME.MN PUBLISHED:2025/11/28      5 MONGOLIA-JAPAN PUBLIC-PRIVATE SECTORS HOLD XII CONSULTATIVE MEETING WWW.MONTSAME.MN PUBLISHED:2025/11/28      6 ULAANBAATAR METRO CONSTRUCTION TO COMMENCE IN 2026 WWW.MONTSAME.MN PUBLISHED:2025/11/28      7 PRIME MINISTER APPOINTS NEW FIRST DEPUTY PRIME MINISTER AND MINISTER OF FOOD, AGRICULTURE AND LIGHT INDUSTRY WWW.MONTSAME.MN PUBLISHED:2025/11/28      8 RIO TINTO TO SELL US BORON ASSETS WWW.MINING.COM PUBLISHED:2025/11/27      9 MONGOLIA MAY JOIN CIS RAILWAY TRANSPORT COUNCIL WWW.REPORT.AZ PUBLISHED:2025/11/27      10 MONGOLIAN SOLAR PLANT: UNIQUE 2024 PROJECT UNVEILED WWW.PVKNOWHOW.COM PUBLISHED:2025/11/27      УЛААНБААТАРТ ИРЭХ ОНД ӨРНӨХ БҮТЭЭН БАЙГУУЛАЛТУУД WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/28     П.НАРАНБАЯР САЙД ХҮҮХДИЙН ЭРХИЙГ ХОХИРООЖ БАЙНА ГЭВ WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/28     2040 ОН ГЭХЭД ДУГУЙН ЗАМЫН НИЙТ УРТЫГ 1677 КМ УРТ БОЛГОХООР ТӨЛӨВЛӨЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/28     “УБТЗ” ХНН 21 ТӨРЛИЙН АЧААГ 24 ЦАГИЙН ТУРШ ЗОГСОЛТГҮЙ ТЭЭВЭРЛЭЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2025/11/28     УЛААНБААТАР МЕТРО ТӨСЛИЙН БҮТЭЭН БАЙГУУЛАЛТЫГ 2026 ОНД ЭХЛҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/11/27     2030 ОНД ЯНЖУУР ТАМХИНЫ ДУНДАЖ ҮНЭ 15 МЯНГАН ТӨГРӨГ БОЛНО WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/11/27     ХАГАС КОКСОН ТҮЛШИЙГ ХУВИЙН ХЭВШЛИЙН ДӨРВӨН КОМПАНИ ТЭЭВЭРЛЭЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2025/11/27     МОНГОЛ, ЯПОНЫ ТӨР, ХУВИЙН ХЭВШЛИЙН XII ЗӨВЛӨЛДӨХ УУЛЗАЛТ БОЛЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/11/27     ДОПИНГИЙН ШИНЖИЛГЭЭНИЙ ДҮН ГАРСНЫ ДАРАА УЛСЫН ЦОЛ ОЛГОХ ТӨСӨЛ САНААЧИЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/27     ЕРӨНХИЙ САЙДЫН ОРОСТ НАЙР ТАВЬСАН САНАЛ НЬ МОНГОЛЫГ БАРУУНЫ ДАВХАР ХОРИГ, FATF-ЫН СААРАЛ ЖАГСААЛТАД ОРУУЛАХ ЭРСДЭЛТЭЙ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/27    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23