1 MONGOLIA AND UK CONDUCT JOINT STUDY ON CYBERSECURITY RISKS WWW.MONTSAME.MN PUBLISHED:2025/11/02      2 RUSSIA, MONGOLIA TO UPGRADE ROAD & RAIL CORRIDORS AND INCREASE FREIGHT TRANSIT WWW.RUSSIASPIVOTTOASIA.COM PUBLISHED:2025/11/02      3 MONGOLIA UPGRADED TO 'BB-' ON SUSTAINED FISCAL CONSOLIDATION AND STRONG GROWTH; OUTLOOK STABLE WWW.SPGLOBAL.COM PUBLISHED:2025/10/31      4 GOVERNMENT OF MONGOLIA LAUNCHES NEGOTIATIONS WITH RIO TINTO WWW.MONTSAME.MN PUBLISHED:2025/10/31      5 MONGOLIA COURT UPHOLDS GOVERNMENT’S TERMINATION OF QSC CONCESSION, CITING “PUBLIC INTEREST” WWW.EGUUR.MN PUBLISHED:2025/10/31      6 EBRD FINANCES CONSTRUCTION OF CARDIOVASCULAR HOSPITAL IN MONGOLIA WWW.EBRD.COM PUBLISHED:2025/10/31      7 ADB TO SUPPORT MONGOLIA’S LARGEST SOLAR AND BATTERY STORAGE PROJECT FOR ENERGY SECURITY WWW.ADB.ORG PUBLISHED:2025/10/31      8 HUNNU CITY POWER INFRASTRUCTURE NEARS COMPLETION WWW.MONTSAME.MN PUBLISHED:2025/10/31      9 MONGOLIA COMMISSIONS 53 NEW FACTORIES AS PART OF ‘FOOD REVOLUTION’ PLAN WWW.MONTSAME.MN PUBLISHED:2025/10/31      10 DEPUTY PRIME MINISTER S.AMARSAIKHAN DISMISSED FOR VIOLATING ACCOUNTABILITY AGREEMENT WWW.GOGO.MN PUBLISHED:2025/10/29      ДЭЛХИЙН БАНКНЫ САНХҮҮЖИЛТЭЭР 102 КМ ДАЛАН СУВАГ ӨРГӨТГӨНӨ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/11/02     “ОЮУ ТОЛГОЙ” КОМПАНИЙН ГҮЙЦЭТГЭХ ЗАХИРАЛ ДЭЙРДРЭ ЛИНГЕНФЭЛДЕРИЙН МОНГОЛ УЛСЫН УУЛ УУРХАЙН САЛБАРТ ОРУУЛСАН ХУВЬ НЭМРИЙГ ҮНЭЛЭН “НАЙРАМДАЛ МЕДАЛЬ”-ААР ШАГНАЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/02     ЧИНГЭЛТЭЙ ДҮҮРГИЙН 300 АЙЛ НОГООН ХАЛААЛТЫН СИСТЕМД ХОЛБОГДОЖ ЭХЭЛЛЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/02     102 АППЛИКЭЙШНЭЭР ЗӨРЧИЛ МЭДЭЭЛСЭН ИРГЭНД ТОРГУУЛИЙН 10-20 ХУВИЙГ ОЛГОНО WWW.EGUUR.MN НИЙТЭЛСЭН:2025/11/02     ЭРЧИМ ХҮЧНИЙ ШӨНИЙН ТАРИФЫН ХӨНГӨЛӨЛТ ӨНӨӨДРӨӨС ХЭРЭГЖИЖ ЭХЭЛЛЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/02     S&P АГЕНТЛАГ ЗАСГИЙН ГАЗРЫН ТӨСВИЙН БОДЛОГЫГ ЭЕРГЭЭР ҮНЭЛЖ, ТОГТВОРТОЙ ҮРГЭЛЖЛҮҮЛЭХ НЬ ЗҮЙТЭЙ ГЭВ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/31     ОЮУ ТОЛГОЙ ТӨСЛИЙН ХУВЬ НИЙЛҮҮЛЭГЧДИЙН ЗЭЭЛИЙН ХҮҮГ ХЭЛЭЛЦЭХ ЭЭЛЖИТ 7 ЖИЛИЙН ХУГАЦААГ ҮЛ ХАРГАЛЗАН ХЭЛЭЛЦЭЭРИЙГ ҮРГЭЛЖЛҮҮЛЭХЭЭР БОЛЛОО WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/31     Э.ШИЖИР: “НИЙТИЙН ЭРХ АШИГ” НЭРИЙН ДОР ХУВИЙН ХЭВШЛИЙН ЭРХИЙГ ЗӨРЧИЖ БОЛОХГҮЙ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/31     Х.БУЛГАНТУЯАГ УИХ-ЫН ДЭД ДАРГААС ЧӨЛӨӨЛЖ, Ж.БАТ-ЭРДЭНИЙГ ДЭВШҮҮЛЭХЭЭР БОЛЛОО WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/31     2025 ОНД ХӨВСГӨЛ АЙМГИЙН 8 СУМАНД 18 УДАА ГАЗАР ХӨДӨЛЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/31    

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23