1 LEGAL REFORMS IN MONGOLIA’S EXTRACTIVE SECTOR WWW.EN.MININGINSIGHT.MN  PUBLISHED:2025/12/24      2 ICONIC SAMUEL BECKETT BRIDGE TO BE ILLUMINATED IN MONGOLIA’S NATIONAL FLAG WWW.MONTSAME.MN PUBLISHED:2025/12/24      3 TUGRUG DEPOSITS RISE BY MNT 3.7 TRILLION WWW.MONTSAME.MN PUBLISHED:2025/12/24      4 CHINA DENIES REPORT OF 100 ICBMS IN BORDER SILOS, URGES U.S. CUTS WWW.UPI.COM PUBLISHED:2025/12/24      5 ERENHOT, LARGEST LAND PORT ON CHINA-MONGOLIA BORDER, SEES RISE IN CROSS-BORDER TRAFFIC VOLUMES WWW.XINHUANET.COM PUBLISHED:2025/12/24      6 CLIMATE RISKS ARE BECOMING FINANCIAL RISKS: WHAT MONGOLIA’S EXPERIENCE REVEALS WWW.UNESCAP.ORG PUBLISHED:2025/12/24      7 4.5 MAGNITUDE EARTHQUAKE HITS SOUTHWESTERN MONGOLIA WWW.XINHUANET.COM PUBLISHED:2025/12/24      8 ENTRÉE RESOURCES PROVIDES UPDATE ON ENTRÉE/OYU TOLGOI JOINT VENTURE LICENSE MATTERS WWW.INVESTINGNEWS.COM PUBLISHED:2025/12/23      9 CHINA QUIETLY LOADS 100+ ICBMS INTO NEW MISSILE SILOS NEAR MONGOLIA: REPORT WWW.FOXNEWS.MN PUBLISHED:2025/12/23      10 MONGOLIA PRESENTS PILOT RESULTS OF NATIONAL MULTIDIMENSIONAL POVERTY INDEX WWW.AKIPRESS.COM PUBLISHED:2025/12/23      “УЛААНБААТАР МЕТРО ТӨСӨЛ”-ИЙН ТЕНДЕРИЙН ХОЁРДУГААР ШАТНЫ ШАЛГАРУУЛАЛТ ЗАРЛАГДЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/24     2026-2028 ОНД ДУЛААНЫ ТАВДУГААР ЦАХИЛГААН СТАНЦЫГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР БАРИНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24     ХОГ ШАТААЖ, ЭРЧИМ ХҮЧ ГАРГАХ ҮЙЛДВЭРИЙН БАРИЛГА УГСРАЛТЫН АЖЛЫГ 2026 ОНД ЭХЛҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/12/24     АЙЛ ӨРХ, ОРОН НУТГИЙН ХЭМЖЭЭНД СЭРГЭЭГДЭХ ЭРЧИМ ХҮЧНИЙ ХЭРЭГЛЭЭГ НЭМЭГДҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/24     ТӨРИЙН ӨМЧИЙН 8 КОМПАНИЙГ ХУВЬЧИЛЖ, 18-ЫГ НЭЭЛТТЭЙ ХУВЬЦААТ КОМПАНИ БОЛГОНО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/24     80,000 ГАРУЙ ТАТВАР ТӨЛӨГЧ 1.29 ИХ НАЯД ТӨГРӨГИЙН ТАТВАР ТӨЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/12/24     ДЭНЖИЙН МЯНГА 93 МВТ ХИЙН ДУЛААНЫ СТАНЦЫГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР БАРИНА WWW.GOGO.MN НИЙТЭЛСЭН:2025/12/24     НИЙСЛЭЛИЙН 2026 ОНЫ ТӨСВӨӨР ШИНЭЭР 207 ТӨСӨЛ, АРГА ХЭМЖЭЭ ХЭРЭГЖҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/12/23     БНХАУ 100 ГАРУЙ ТИВ АЛГАСАГЧ ПУУЖИНГ МОНГОЛЫН ОЙРОЛЦОО БАЙРШУУЛСАН БАЙЖ БОЛЗОШГҮЙ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/12/23     ТӨГРӨГИЙН АМ.ДОЛЛАРТАЙ ХАРЬЦАХ ХАНШ 158 ТӨГРӨГӨӨР СУЛАРЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/12/22    

Russian Government to Allocate $1.5 Bln to Highway in Crimea www.themoscowtimes.com

The Russian government has decided to allocate 100 billion rubles ($1.5 billion) to building a highway connecting the capital of Crimea, Simferopol, to the town of Kerch, the Slon news website reported Monday. The highway, named Tavrida, is set to be opened by 2020.
 
“Last week, not without problems and debates, we found funds necessary to build the highway. The sum is significant – more than 100 billion rubles — and it requires special attention,” Prime Minster Dmitry Medvedev said, Slon reported.
 
The highway project is not the only major infrastructure development in Crimea. The Kerch bridge, a 19-kilometer dual road-rail bridge to connect Crimea with Russia's Krasnodar region, is also underway in the region. The project, which is currently scheduled for completion in 2018, will ensure that the disputed peninsula is accessible by car and train directly from Russia. The bridge is set to cost a total of 212 billion rubles ($3.25 billion) and is hoped to ultimately join up to the Tavrida highway.
 
President Vladimir Putin visited the construction site in March this year, and promised to “hang” anyone responsible for the project's possible late completion.


Published Date:2016-07-26