1 RIO TINTO SAYS Q3 PRODUCTION FALLS ON PLANNED MAINTENANCE AND SAFETY PAUSES WWW.MINING.COM PUBLISHED:2018/10/16      2 AUSTRALIAN FIRM ACQUIRES CENTERRA GOLD ASSETS IN MONGOLIA WWW.ZGM.MN PUBLISHED:2018/10/16      3 RUSSIAN DEFENSE MINISTER TO PAY OFFICIAL VISIT TO MONGOLIA WWW.MONTSAME.MN PUBLISHED:2018/10/16      4 NORTH KOREA STRENGTHENS TIES WITH MONGOLIA WWW.KOREATIMES.CO.KR PUBLISHED:2018/10/16      5 AZERBAIJAN SENT AN EXPORT MISSION TO MONGOLIA WWW.AZERNEWS.AZ PUBLISHED:2018/10/16      6 DEPUTY PM CALLS FOR STRONGER VIETNAM-MONGOLIA TIES ACROSS MULTIPLE FIELDS WWW.VIETNAMPLUS.VN PUBLISHED:2018/10/16      7 MONGOLIAN NATIONAL OLYMPIC COMMITTEE HOST INAUGURAL BEACH SPORTS AND ART GAMES WWW.INSIDETHEGAMES.BIZ PUBLISHED:2018/10/16      8 ON AND OFF WIND AND SOLAR POWER PUSHING COAL PLANTS TO THE BRINK WWW.MINING.COM PUBLISHED:2018/10/16      9 FACEBOOK TOOL MAKES UK POLITICAL ADS 'TRANSPARENT' WWW.BBC.COM PUBLISHED:2018/10/16      10 HUNNU AIR BEGINS TO OPERATE BETWEEN ULAN-UDE AND MANZHOULI WWW.NEWS.MN PUBLISHED:2018/10/16      ДАРХАН, СЭЛЭНГЭ, ТӨВ, ХӨВСГӨЛИЙН АЛТ ТУШААГЧИД НИЙСЛЭЛИЙГ ЗОРИХ ШААРДЛАГАГҮЙ WWW.GOGO.MN НИЙТЭЛСЭН:2018/10/16     МӨНГӨНИЙ НИЙЛҮҮЛЭЛТИЙН ӨСӨЛТӨД ТӨГРӨГ, ВАЛЮТЫН ХАРИЛЦАХ, ТӨГРӨГИЙН ХАДГАЛАМЖ ГОЛЛОН НӨЛӨӨЛЖЭЭ WWW.BLOOMBERGTV.MN  НИЙТЭЛСЭН:2018/10/16     "УГТУУЛ-АЛТАЙ" ХХК: ДОТООДЫН ҮЙЛДВЭРҮҮД БҮРЭН ЧАДЛААРАА АЖИЛЛАВАЛ 2020 ОН ГЭХЭД ӨНДӨГ ИМПОРТЛОХ ШААРДЛАГАГҮЙ БОЛНО WWW.BLOOMBERGTV.MN  НИЙТЭЛСЭН:2018/10/16     ХҮН ТӨВТЭЙ БИЗНЕСИЙН ХААНЧЛАЛ АЙСУЙ WWW.ZGM.MN НИЙТЭЛСЭН:2018/10/16     ГАЗРЫН ТОС БОЛОВСРУУЛАХ ҮЙЛДВЭРИЙН ДЭД БҮТЦИЙН АЖИЛ 40 ХУВЬТАЙ БАЙНА WWW.UNUUDUR.MN НИЙТЭЛСЭН:2018/10/16     СТРАТЕГИЙН ОРД АШИГЛАДАГ КОМПАНИУДЫН ДАНСЫГ МОНГОЛБАНКИНД БАЙРШУУЛАХ ХУУЛИЙН ТӨСЛИЙГ ДЭМЖЛЭЭ WWW.MEDEE.MN НИЙТЭЛСЭН:2018/10/16     У.ХҮРЭЛСҮХ: ДОТООДДОО ҮЙЛДВЭРЛЭСЭН ЦЕМЕНТИЙГ ЭКСПОРТОД ГАРГАХ НЬ ЧУХАЛ WWW.MONTSAME.MN НИЙТЭЛСЭН:2018/10/16     АЖ АХУЙН НЭГЖҮҮД ЖДҮДС-ГААС 3.8 ИХ НАЯД ТӨГРӨГИЙН САНХҮҮЖИЛТ ХҮСЧЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2018/10/16     ВАЛЮТЫН ЗОХИЦУУЛАЛТЫН ТУХАЙ ХУУЛИЙН ТӨСЛИЙГ ХЭЛЭЛЦЭХ ЭСЭХИЙГ УИХ ЭНЭ ДОЛОО ХОНОГТ ШИЙДНЭ WWW.BLOOMBERGTV.MN НИЙТЭЛСЭН:2018/10/15     ХЭРЭГЛЭЭНИЙ ЗЭЭЛИЙН ӨСӨЛТ АЙЛ, ӨРХҮҮДИЙГ ӨРИЙН ДАРАМТАД ОРУУЛЖ БАЙНА ГЭВ WWW.MONTSAME.MN  НИЙТЭЛСЭН:2018/10/15    

Building materials-CSA cement(China)

We mainly deal in exporting of building materials, including traditional building materials, insulation materials, water-proofing materials, decoration materials, high temperature materials, fiberglass materials, etc. 
We would like to recommend you our calcium sulfoaluminate cement (CSA cement). This is a kind of rapid set cement that is used in many applications such as light partition board for buildings, bridge decks, airport runways, patching roadways, sidewalks, etc. Additionally, it is sometimes used in shrinkage compensated concrete by mixing with Portland cement and for controlled low-strength materials used for dig gable back-filling of utility trenches.

Our product strength grade: 42.5, 52.5, 62.5
If you are in market of building materials, please feel free to contact us. We can provide you high quality products with best price.

CSA cement is a kind of rapid-setting cement. It has tremendous advantages:

  1. Rapid Strength Gain: It is possible that concrete make of CSA cement can achieve 28 days’ strength in 24 hours. It can save more time for you during your construction schedule.

  2. Lower Alkalinity

  3. Lower Shrinkage

  4. Shorter Curing Time

 

Our CSA cement is famous for its excellent rapid-setting characteristic and we have exported to many countries of the world.

 

Specifications of our Cement:

  1. Strength grade: 42.5

Initial setting time: Not early than 7 minutes (Can be customized)

Final setting time:   Not later than 10 minutes (Can be customized)

Stripping time:      Not later than 60 minutes in summer (Can be customized)

                     Not later than 180 minutes in winter (Can be customized)

 

  1. Strength grade: 52.5

Initial setting time: Not early than 10 minutes (Can be customized)

Final setting time:    Not later than 15 minutes (Can be customized)

Stripping time:        Not later than 60 minutes in summer (Can be customized)

                     Not later than 180 minutes in winter (Can be customized)

Application:

  1. Construction in winter or cold day

  2. Repair engineering, such as patching roadways, sidewalks, airport runway

  3. Bridge deck and highway engineering

  4. Precast concrete products

  5. Lightweight concrete partition board

  6. Artistic concrete fence

  7. Mixed with OPC cement for shortening the setting time of concrete

If you are interested in it, please feel free to contact us.