1 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      2 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      3 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      4 P.NARANBAYAR ANNOUNCES PLAN TO DRAFT LAW TO RESTRICT CHILDREN’S USE OF SOCIAL NETWORKS WWW.GOGO.MN PUBLISHED:2026/02/25      5 “EAGLE FESTIVAL-2026” TO BE HELD ON MARCH 7-8 WWW.GOGO.MN PUBLISHED:2026/02/24      6 BEATE DASTEL: UNICEF WILL CONTINUE THE IMPLEMENTATION OF SUCCESSFUL PROJECTS AND PROGRAMS IN MONGOLIA WWW.OPEN.KG PUBLISHED:2026/02/24      7 SAXAUL TREE CULTIVATED IN WINTER GREENHOUSE FOR FIRST TIME IN MONGOLIA WWW.MONTSAME.MN PUBLISHED:2026/02/24      8 MONGOLIA'S PROPOSED SENIOR UNSECURED NOTES ASSIGNED 'BB-' LONG-TERM FOREIGN CURRENCY RATING WWW.SPGLOBAL.COM PUBLISHED:2026/02/24      9 MOODY’S ASSIGNS B1 RATING TO MONGOLIA BONDS ON REFINANCING PLAN WWW.IN.INVESTING.COM PUBLISHED:2026/02/24      10 THE 2250-KM, MORE DIVERSE ALTERNATIVE TO THE TRANS-SIBERIAN RAILWAY WWW.BRISBANETIMES.COM.AU PUBLISHED:2026/02/24      НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     ХӨРСНИЙ УС, ҮЕРИЙН ХАМГААЛАЛТЫН ТӨСЛИЙН ТЭЗҮ-ИЙГ БОЛОВСРУУЛАХ АЖИЛ 90 ХУВЬТАЙ ХЭРЭГЖИЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     COP17 БАГА ХУРЛЫН БЭЛТГЭЛ ХАНГАХ ХҮРЭЭНД ТЕНДЕРГҮЙ, ШУУД ХУДАЛДАН АВАЛТ ХИЙХ ЭРХИЙГ ӨГЧЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     "ЭРДЭНЭБҮРЭНГИЙН УСАН ЦАХИЛГААН СТАНЦЫН АЖЛЫН ЯВЦ 20 ХУВЬТАЙ БАЙНА" WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     ТӨМӨР ЗАМЫН ТЕРМИНАЛЫН ДЭД БҮТЦИЙГ САНХҮҮЖҮҮЛЭХ САНАЛ ТАВЬЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     НИЙСЛЭЛД ЖИЛДЭЭ 44.420 ТОНН ХУВАНЦАРЫГ ДАХИН БОЛОВСРУУЛНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     МОНГОЛ УЛС, БНСУ-ЫН ГХЯ ХООРОНДЫН СТРАТЕГИЙН УУЛЗАЛТ БОЛОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСЛИЙН ЯВЦ 60.5 ХУВЬТАЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/24    

Geodome

Price: USD10000/ 1set

geodome is the most advanced building systems in the world, economic and

efficiency, secure, sustainable housing made of ‘Fiberglass Reinforced Plastics

 

geodome can be assembled, erected, finished interior in a day.

 

geodome is ever lasting building (up to 50 years )

 

geodome technology combines in three major advantages: 

1) strength of the dome shape,

2) constructed of molded GRP Panel,

3) eco-friendly inside insulation (at the field).

 

<Dome structure performance>

Resistance of nature disaster (hurricane, earthquake, flood, snowstorm, tornado)

High impact resistance

High structural load capacity

Lower heating and cooling cost

 

<FRP panel performance>

Quick construction

Portability and re-fabricate

Fire retardant.

No maintenance

Resistance of sunlight (UV protect).

Water and moisture resistance

No deterioration, mildew, rot, rust, corrosion

No termites, insects

 

<Uses>

The versatility of the geodome allows it to be put to a variety of uses:

   Residential (glamping camp, bungalow, cottage, lodge)

   Specialized uses (military base, labor accommodation, disaster shelter,)

   Education facility (class room, recreation room)

   Regional facility (mosque, church)

   Environmental facility (desert, beach, marina, rough terrain, mountain)

 

<Features>

  • Highly energy efficient

  • A green / sustainable / environmentally friendly product

  • Free span truss design permitting open and flexible floor plans

  • Water and moisture resistant

  • Rot and decay resistant

  • Mold, mildew, and insect resistant

  • Highly resistant to high wind and hurricane forces

  • Highly resistant to seismic forces

  • Easy to maintain

  • Affordable and cost effective

  • Backed by a 30 year Limited Warranty

  • No painting, sealing or roofing required

  • Structure is contained within the panels

  • No heavy equipment required at site

     

<Benefits>

  • Ready to assemble upon delivery, quickly and easily

  • Comprised of light weight panels

  • Incorporate large size panels to speed erection and minimize connections

  • Require less skilled labor and fewer trade contractors for assembly

  • Does not require heavy equipment on site for handling of installation

  • Proprietary connection system

  • Does not require any special tools or equipment for assembly

  • Does not require a vapor barrier / retarder

  • Does not require a weather resistant barrier.

  • Does not require any additional on – site exterior finish materials

  • Shell complete upon installation of last panel

  • May be dis-assembled and re-assembled with no degradation in performance

  • Does not produce any site waste

  • UV resistant facing surfaces