1 43,000 PASSENGER CARS IMPORTED IN THE FIRST HALF OF 2026 WWW.GOGO.MN PUBLISHED:2026/08/12      2 OIL REFINERY CONSTRUCTION TO BE INTENSIFIED AND LEGISLATIVE BOTTLENECKS REMOVED WWW.MONTSAME.MN PUBLISHED:2026/08/12      3 TEN YEARS OF 'HUNNU ROCK': THE HU LAUNCHES NEW WORLD TOUR WWW.MONTSAME.MN PUBLISHED:2026/08/12      4 NATIONAL AI COUNCIL ESTABLISHED TO DRIVE DIGITAL ECONOMY WWW.MONTSAME.MN PUBLISHED:2026/08/12      5 THE MAGIC OF MONGOLIA: WHY PEOPLE VISIT THE MOST SPARSELY POPULATED COUNTRY IN THE WORLD WWW.JACKSFLIGHTCLUB.COM PUBLISHED:2026/08/12      6 THE MOST EXPENSIVE MISTAKE MONGOLIAN COMPANIES KEEP MAKING AND CALLING IT A HIRING DECISION (BLOG) WWW.LAMBDA.GLOBAL PUBLISHED:2026/08/12      7 MONGOLIA SUCCESSFULLY TESTS INTERCITY FREIGHT TRANSPORT WITH HEAVY ELECTRIC TRUCKS FOR THE FIRST TIME WWW.OPEN.KG PUBLISHED:2026/08/12      8 MONGOLIA RATIONS GASOLINE AS FUEL SHORTAGES SEND DRIVERS INTO LONG LINES WWW.INTELLINEWS.COM PUBLISHED:2026/08/12      9 VIEWS EXCHANGED WITH ADB ON EDUCATION SECTOR REFORM AND COOPERATION WWW.MONTSAME.MN PUBLISHED:2026/08/12      10 “FOREIGNERS WHO LEARN ABOUT CHINGGIS KHAAN THROUGH HISTORY AND THE HU THROUGH MUSIC ARE BECOMING MORE INTERESTED IN THE MONGOLIAN LANGUAGE” WWW.GOGO.MN PUBLISHED:2026/08/12      Ц.САНДАГ-ОЧИР: МОНГОЛ УЛСЫН НИЙТ ГАЗАР НУТГИЙН 81.9 ХУВЬ ЦӨЛЖИЛТӨД ӨРТСӨН БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/08/12     МӨНГӨНИЙ БОДЛОГЫН ХҮҮГ 0.5 ХУВИАР ӨСГӨВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/08/12     ШАТАХУУН ОЛГОДОГ ЗОХИЦУУЛАЛТЫГ БЯМБА ГАРАГААР ТАСАЛБАР БОЛГОНО WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/08/12     БАГАХАНГАЙ-ХӨШИГИЙН ХӨНДИЙ-ЭМЭЭЛТ ЧИГЛЭЛИЙН 214.9 КМ ТӨМӨР ЗАМ ИРЭХ САРД АШИГЛАЛТАД ОРНО WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/08/12     "НЕФТЬ БОЛОВСРУУЛАХ ҮЙЛДВЭРИЙГ ТҮШИГЛЭН ТЕХНОЛОГИЙН ПАРК БАЙГУУЛНА" WWW.NEWS.MN НИЙТЭЛСЭН:2026/08/12     “БАЯНХОШУУ ДЭД ТӨВ”-ИЙН ДАРААГИЙН 150 АЙЛЫН БАРИЛГЫН АЖИЛ 92 ХУВЬТАЙ БАЙНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/08/12     НАЙМДУГААР САРЫН ШАТАХУУНЫ ХЭРЭГЛЭЭГ БҮРЭН ХАНГАХ НӨХЦӨЛ БҮРДЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/08/12     БАГАХАНГАЙ -ХӨШИГИЙН ХӨНДИЙ - ЭМЭЭЛТ ЧИГЛЭЛИЙН ТӨМӨР ЗАМЫН ТӨСЛИЙГ ХЭЛЭЛЦЭНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/08/12     МОНГОЛ ДАХЬ ГАДААД АЖИЛЧДЫН ТОО 43 ХУВИАР ӨСЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/08/12     "ШАТАХУУНЫ НӨӨЦГҮЙ БОЛСОН УЛС, ОРНУУД ЗАЙНААС АЖИЛЛАХ БОДЛОГО ХЭРЭГЖҮҮЛЖ ЭХЭЛСЭН" WWW.GOGO.MN НИЙТЭЛСЭН:2026/08/12    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Sandstorm Q3 gold output jumps, second best in company history www.mining.com

Sandstorm Gold Ltd. (NYSE MKT: SAND, TSX: SSL) is pleased to report the attributable gold equivalent ounces sold during the third quarter of 2017 and recent updates from the Company's royalty properties.

Erdene Continues to Define New Zone at Bayan Khundii, Receives Positive Metallurgical Results

Erdene Resource Development Corp. ("Erdene") announced additional assay results from their ongoing 2017 drill program at the Bayan Khundii project in southwest Mongolia. A total of 19,386 metres have been drilled in 2017 and during the fourth quarter Erdene will be testing a series of geophysical and geochemical targets within the larger Bayan Khundii prospect area.

Results from drilling completed during the third quarter have continued to define a high-grade zone between the Midfield and Striker Zones. Hole BKD-194 is the latest in a series of holes confirming the continuity between these two high-grade zones. Three holes were also drilled to test potential continuity of gold mineralization west of the Midfield Zone (BKD-183,189 and 190) and a single hole (BKD-198) was drilled 130 metres west of the Striker Zone to test the down-dip potential of previously completed hole BKD-32 which returned a broad zone of low-grade mineralization during 2016 drilling. This hole confirmed higher grades at depth. Drill highlights include:

BKD-188: 120.0 metres of 1.1 g/t gold from 110.0 metres including 3.0 metres of 33.1 g/t gold from 176.0 metres;
BKD-194: 128.0 metres of 1.1 g/t gold from 49.0 metres including 22.0 metres of 3.3 g/t gold from 115.0 metres;
BKD-196: 22.0 metres of 2.4 g/t gold from 112.0 metres including 1.0 metre of 43.1 g/t gold from 118.0 metres;
BKD 197: 6.0 metres of 2.7 g/t gold from 130.0 metres;
BKD-198: 25.0 metres of 1.4 g/t gold from 144.0 metres including 3.0 metres of 7.8 g/t gold from 145.0 metres; and
BKD-30ext: 58.0 metres of 1.2 g/t gold from 59.0 metres including 16.0 metres of 2.8 g/t gold from 87.0 metres.
The results from Phase I metallurgical testing at Bayan Khundii has come back positive with two master composites indicating that gold from the project is free milling and amenable to conventional processing techniques.

Sandstorm has a 2.0% NSR royalty on Erdene's Bayan Khundii and Altan Narprojects.

Reported intervals are not true width. For more information and for complete drill results visit Erdene's website at www.erdene.com and see the press releases dated September 14, 2017 and September 12, 2017.



Published Date:2017-10-04