1 SECURITIES TRADING REACHES MNT 1 TRILLION WWW.MONTSAME.MN PUBLISHED:2026/09/27      2 MINISTRIES MEET ICC DELEGATION WWW.UBPOST.MN PUBLISHED:2026/09/27      3 VERIFICATION DEMANDED OVER CITIZENSHIP OF CONTESTANT REPRESENTING MONGOLIA AT MISS GRAND INTERNATIONAL WWW.GOGO.MN PUBLISHED:2026/09/27      4 ULAANBAATAR DESIGNATES EIGHT SITES FOR AUTUMN TREE PLANTING WWW.GOGO.MN PUBLISHED:2026/09/27      5 OUTSTANDING BANK LOANS RISE 14.3 PERCENT WWW.MONTSAME.MN PUBLISHED:2026/09/24      6 CENTRAL ASIA AND MONGOLIA GROWTH TO REMAIN ROBUST WWW.EBRD.COM PUBLISHED:2026/09/24      7 A NEW OIL STORAGE FACILITY WITH A CAPACITY OF 16,000 CUBIC METERS HAS BEEN PUT INTO OPERATION IN MONGOLIA WWW.OPEN.KG PUBLISHED:2026/09/24      8 RUSSIA, MONGOLIA FORM WORKING GROUP TO EXAMINE FEASIBILITY OF A WESTERN RAIL CORRIDOR WWW.RUSSIASPIVOTTOASIA.COM PUBLISHED:2026/09/24      9 MONGOLIA SUBMITS CANDIDACY FOR UN SECURITY COUNCIL NON-PERMANENT SEAT FOR 2048–2049 WWW.MONTSAME.MN PUBLISHED:2026/09/24      10 ‘GASOLINE DISRUPTION MAY LAST 2 TO 3 YEARS’ WWW.UBPOST.MN PUBLISHED:2026/09/24      ЕРӨНХИЙ САЙД Н.УЧРАЛ ЯПОН УЛСАД АЛБАН ЁСНЫ АЙЛЧЛАЛ ХИЙХЭЭР МОРДЛОО WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     MININGWEEK 2026: НИЙТ ГАЗАР НУТГИЙНХАА 21 ХУВЬД АШИГТ МАЛТМАЛЫН ЛИЦЕНЗ ОЛГОХ БОЛОМЖТОЙ WWW.GOGO.MN НИЙТЭЛСЭН:2026/09/27     ДҮНЖИНГАРАВЫН УУЛЗВАРТ БОЛСОН ДЭЛБЭРЭЛТИЙН ХЭРГИЙГ НЭМЭЛТ МӨРДӨН БАЙЦААЛТ ХИЙЛГЭХЭЭР ПРОКУРОРТ БУЦААВ WWW.IKON.MN НИЙТЭЛСЭН:2026/09/27     “МОНГОЛЫН НОГООН, ХҮРТЭЭМЖТЭЙ ХОТУУД” ТӨСЛИЙГ ХЭРЭГЖҮҮЛЖ ЭХЭЛЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     АГААРЫН ТЭЭВРИЙН ХАМТЫН АЖИЛЛАГААГ ӨРГӨЖҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     26 МЯНГАН ХҮН УРГАЦ ХУРААЛТАД ОРОЛЦОЖ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/09/27     ШҮҮХЭЭС НАЙРУУЛАГЧ Б.БААТАРТ ХИЛИЙН ХОРИГ ТАВЬЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/09/26     "ХӨРӨНГӨ ОРУУЛАГЧДЫН ГОМДЛЫГ 30 ХОНОГТ ШИЙДВЭРЛЭХ ШИНЭ ЗОХИЦУУЛАЛТ ХЭРЭГЖИЖ ЭХЭЛСЭН" WWW.NEWS.MN НИЙТЭЛСЭН:2026/09/24     “МЯНГАД НАР” 19.8 МВТ-ЫН НАРНЫ ЦАХИЛГААН СТАНЦЫН ГҮЙЦЭТГЭЛ 40 ХУВЬТАЙ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/09/24     ГОВИЙН БҮСЭД ЗАРЛАСАН СЭРГЭЭГДЭХ ЭРЧИМ ХҮЧНИЙ АУКЦИОНД ГУРВАН КОМПАНИЙН ХАМТАРСАН ТҮНШЛЭЛ ШАЛГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/09/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Sandstorm Q3 gold output jumps, second best in company history www.mining.com

Sandstorm Gold Ltd. (NYSE MKT: SAND, TSX: SSL) is pleased to report the attributable gold equivalent ounces sold during the third quarter of 2017 and recent updates from the Company's royalty properties.

Erdene Continues to Define New Zone at Bayan Khundii, Receives Positive Metallurgical Results

Erdene Resource Development Corp. ("Erdene") announced additional assay results from their ongoing 2017 drill program at the Bayan Khundii project in southwest Mongolia. A total of 19,386 metres have been drilled in 2017 and during the fourth quarter Erdene will be testing a series of geophysical and geochemical targets within the larger Bayan Khundii prospect area.

Results from drilling completed during the third quarter have continued to define a high-grade zone between the Midfield and Striker Zones. Hole BKD-194 is the latest in a series of holes confirming the continuity between these two high-grade zones. Three holes were also drilled to test potential continuity of gold mineralization west of the Midfield Zone (BKD-183,189 and 190) and a single hole (BKD-198) was drilled 130 metres west of the Striker Zone to test the down-dip potential of previously completed hole BKD-32 which returned a broad zone of low-grade mineralization during 2016 drilling. This hole confirmed higher grades at depth. Drill highlights include:

BKD-188: 120.0 metres of 1.1 g/t gold from 110.0 metres including 3.0 metres of 33.1 g/t gold from 176.0 metres;
BKD-194: 128.0 metres of 1.1 g/t gold from 49.0 metres including 22.0 metres of 3.3 g/t gold from 115.0 metres;
BKD-196: 22.0 metres of 2.4 g/t gold from 112.0 metres including 1.0 metre of 43.1 g/t gold from 118.0 metres;
BKD 197: 6.0 metres of 2.7 g/t gold from 130.0 metres;
BKD-198: 25.0 metres of 1.4 g/t gold from 144.0 metres including 3.0 metres of 7.8 g/t gold from 145.0 metres; and
BKD-30ext: 58.0 metres of 1.2 g/t gold from 59.0 metres including 16.0 metres of 2.8 g/t gold from 87.0 metres.
The results from Phase I metallurgical testing at Bayan Khundii has come back positive with two master composites indicating that gold from the project is free milling and amenable to conventional processing techniques.

Sandstorm has a 2.0% NSR royalty on Erdene's Bayan Khundii and Altan Narprojects.

Reported intervals are not true width. For more information and for complete drill results visit Erdene's website at www.erdene.com and see the press releases dated September 14, 2017 and September 12, 2017.



Published Date:2017-10-04