1 DEPUTY PRIME MINISTER S.AMARSAIKHAN DISMISSED FOR VIOLATING ACCOUNTABILITY AGREEMENT WWW.GOGO.MN PUBLISHED:2025/10/29      2 STATE EMERGENCY COMMISSION ORDERS READINESS AMID FUEL-SHORTAGE RISKS WWW.GOGO.MN PUBLISHED:2025/10/29      3 WORLD BANK TO ASSIST MONGOLIA IN COP17 PREPARATIONS WWW.MONTSAME.MN PUBLISHED:2025/10/29      4 CRIMINAL INVESTIGATION LAUNCHED AGAINST MP D.AMARBAYASGALAN WWW.GOGO.MN PUBLISHED:2025/10/28      5 MONGOLIA AND GERMANY TO HOLD NEGOTIATIONS ON DEVELOPMENT COOPERATION WWW.MONTSAME.MN PUBLISHED:2025/10/28      6 MONGOLIAN HEALTH WORKERS BEGIN STRIKE AFTER EIGHT DAYS OF PROTEST WWW.ASIANEWS.NETWORK PUBLISHED:2025/10/28      7 STEPPE FIRE DESTROYS 800 HECTARES OF LAND IN EASTERN MONGOLIA WWW.XINHUANET.COM PUBLISHED:2025/10/28      8 MONGOLIA’S CORRUPTION PROBE AT OYU TOLGOI MINING OPERATIONS UNFOLDS WWW.DISCOVERYALERT.COM.AU PUBLISHED:2025/10/28      9 RIO TINTO AND SPIC QIYUAN BEGIN BATTERY-SWAP TRUCK TRIAL IN MONGOLIA WWW.MINING-TECHNOLOGY.COM PUBLISHED:2025/10/28      10 THE EUROPEAN UNION - MONGOLIA BUSINESS AND INVESTMENT FORUM LAUNCHES A NEW ERA OF ECONOMIC PARTNERSHIP WWW.EEAS.EUROPA.EU PUBLISHED:2025/10/28      "С.АМАРСАЙХАН ХАРИУЦЛАГЫН ГЭРЭЭ ЗӨРЧСӨН ТУЛ ЕРӨНХИЙ САЙД Г.ЗАНДАНШАТАР АЛБАН ТУШААЛААС НЬ ОГЦРУУЛСАН" WWW.EAGLE.MN НИЙТЭЛСЭН:2025/10/29     ЗГ: ГЭР БҮЛИЙН ТУХАЙ ХУУЛИЙН ШИНЭЧИЛСЭН НАЙРУУЛГЫГ ХЭЛЭЛЦЭНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/29     ҮСХ: ДИЗЕЛИЙН ТҮЛШ ЛИТР ТУТАМДАА 74 ТӨГРӨГӨӨР ӨСӨЖ ₮3014 БОЛОВ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/29     ЭНЭ ОНЫ ЭХНИЙ 10 САРД 14,785 ХҮҮХЭД ХҮЧИРХИЙЛЭЛД ӨРТЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/29     РИО ТИНТО ГРУПП ОЮУТОЛГОЙ ХХК-Д АВЛИГЫН ЭСРЭГ ШАЛГАЛТ ЭХЛҮҮЛЭВ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/28     УОК: ЭРСДЭЛД БЭЛЭН БАЙХЫГ ҮҮРЭГ БОЛГОВ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/28     ЛАГ ШАТААХ ҮЙЛДВЭР ТӨСЛИЙГ ТӨР, ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭЛЭЭР ХЭРЭГЖҮҮЛНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/28     УЛААНБААТАР-СИНГАПУРЫН ЧИГЛЭЛД ШУУД НИСЛЭГ ҮЙЛДЭНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/10/28     ЗАЙСАНГИЙН ГҮҮРИЙГ 54 ЖИЛИЙН ДАРАА БҮРЭН ШИНЭЧИЛЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/28     ЦЕГ-ЫН ДАРГААР Ж.БОЛДЫГ ТОМИЛЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/28    

Sandstorm Q3 gold output jumps, second best in company history www.mining.com

Sandstorm Gold Ltd. (NYSE MKT: SAND, TSX: SSL) is pleased to report the attributable gold equivalent ounces sold during the third quarter of 2017 and recent updates from the Company's royalty properties.

Erdene Continues to Define New Zone at Bayan Khundii, Receives Positive Metallurgical Results

Erdene Resource Development Corp. ("Erdene") announced additional assay results from their ongoing 2017 drill program at the Bayan Khundii project in southwest Mongolia. A total of 19,386 metres have been drilled in 2017 and during the fourth quarter Erdene will be testing a series of geophysical and geochemical targets within the larger Bayan Khundii prospect area.

Results from drilling completed during the third quarter have continued to define a high-grade zone between the Midfield and Striker Zones. Hole BKD-194 is the latest in a series of holes confirming the continuity between these two high-grade zones. Three holes were also drilled to test potential continuity of gold mineralization west of the Midfield Zone (BKD-183,189 and 190) and a single hole (BKD-198) was drilled 130 metres west of the Striker Zone to test the down-dip potential of previously completed hole BKD-32 which returned a broad zone of low-grade mineralization during 2016 drilling. This hole confirmed higher grades at depth. Drill highlights include:

BKD-188: 120.0 metres of 1.1 g/t gold from 110.0 metres including 3.0 metres of 33.1 g/t gold from 176.0 metres;
BKD-194: 128.0 metres of 1.1 g/t gold from 49.0 metres including 22.0 metres of 3.3 g/t gold from 115.0 metres;
BKD-196: 22.0 metres of 2.4 g/t gold from 112.0 metres including 1.0 metre of 43.1 g/t gold from 118.0 metres;
BKD 197: 6.0 metres of 2.7 g/t gold from 130.0 metres;
BKD-198: 25.0 metres of 1.4 g/t gold from 144.0 metres including 3.0 metres of 7.8 g/t gold from 145.0 metres; and
BKD-30ext: 58.0 metres of 1.2 g/t gold from 59.0 metres including 16.0 metres of 2.8 g/t gold from 87.0 metres.
The results from Phase I metallurgical testing at Bayan Khundii has come back positive with two master composites indicating that gold from the project is free milling and amenable to conventional processing techniques.

Sandstorm has a 2.0% NSR royalty on Erdene's Bayan Khundii and Altan Narprojects.

Reported intervals are not true width. For more information and for complete drill results visit Erdene's website at www.erdene.com and see the press releases dated September 14, 2017 and September 12, 2017.



Published Date:2017-10-04