1 MONGOLIA RECEIVES NATIONAL PRODUCTIVITY MASTER PLAN (2026–35) TO DRIVE PRODUCTIVITY-LED GROWTH, RESILIENCE, AND SHARED PROSPERITY WWW.GLOBALNEWSWIRE.COM PUBLISHED:2026/01/29      2 78 FOREIGN NATIONALS FROM 12 COUNTRIES DEPORTED FROM MONGOLIA WWW.GOGO.MN PUBLISHED:2026/01/29      3 JAPANESE MILITARY MAPS REVEAL FIRST LOOK AT THE HIDDEN GREAT MONGOLIAN ROAD WWW.INDIANDEFENCEREVIEW.COM PUBLISHED:2026/01/29      4 SILVER ELEPHANT ANNOUNCES FAVORABLE TAX TRIBUNAL RULING IN MONGOLIA WWW.INVESTINGNEWS.COM PUBLISHED:2026/01/29      5 MELTING RESERVES OF POWER: MONGOLIA’S GLACIERS AND THE FUTURE OF ENERGY AND FOOD SECURITY WWW.RELIEFWEB.INT PUBLISHED:2026/01/28      6 MONGOLIA CONSTRUCTION INDUSTRY REPORT 2025: OUTPUT TO GROW AT AN AAGR OF 4.3% BETWEEN 2026-2029, SUPPORTED BY INVESTMENTS IN TRANSPORTATION, ELECTRICITY, AND INFRASTRUCTURE - RESEARCHANDMARKETS.COM WWW.BUSINESSWIRE.COM PUBLISHED:2026/01/28      7 EMERGING CHANGES IN THE METHODS AND TACTICS OF HUMAN TRAFFICKING WWW.GOV.MN PUBLISHED:2026/01/28      8 MONGOLIA PLANS TO PRODUCE 90 MILLION TONS OF COAL THIS YEAR WWW.MONTSAME.MN PUBLISHED:2026/01/27      9 MINING SECTOR WEEK OPENS, PLANNED LEGAL REFORMS OUTLINED WWW.MONTSAME.MN PUBLISHED:2026/01/27      10 13 PEOPLE FREEZE TO DEATH IN MONGOLIA IN JANUARY WWW.XINHUANET.COM PUBLISHED:2026/01/27      МАНАЙ УЛС ДАХЬ ХАМГИЙН УРТ БУЮУ 12.6 КМ ДАМЖУУРГЫГ АШИГЛАЛТАД ОРУУЛЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/29     ББСБ-УУДЫН ХЭРЭГЛЭЭНИЙ БОЛОН ЦАХИМ ЗЭЭЛИЙН ДАВХАРДЛЫГ БУУРУУЛАХ ШИЙДВЭР ГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/29     НИСЭХ БУУДЛЫН ӨРГӨТГӨЛИЙГ ЯАРАЛТАЙ ЭХЛЭХ ШААРДЛАГАТАЙГ ДАХИН ТОДОТГОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/29     “ЗЭРЛЭГ АДУУГ ДАХИН НУТАГШУУЛАХ” ТӨСӨЛ ХЭРЭГЖИНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/29     МОНГОЛ УЛСЫН ГАДААД ПАСПОРТ ХҮЧИРХЭГ БАЙДЛААРАА 73-Т ЖАГСЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/29     АНУ-ЫН ХУДАЛДАА, ХӨГЖЛИЙН АГЕНТЛАГ МОНГОЛД 2.2 САЯ ДОЛЛАРЫН БУЦАЛТГҮЙ ТУСЛАМЖ ҮЗҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/29     ЗЭСИЙН БАЯЖМАЛЫН ҮЙЛДВЭРИЙН ТӨСЛИЙН ХАМТРАГЧИЙГ ЭНЭ ОНЫ I УЛИРАЛД ШАЛГАРУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/29     АЖ ҮЙЛДВЭРИЙН САЛБАРЫН НИЙТ ҮЙЛДВЭРЛЭЛ ӨМНӨХ ОНЫ МӨН ҮЕЭС 4.8 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28     ЗГ: ЗЭС ХАЙЛУУЛАХ ҮЙЛДВЭРИЙН СОНГОН ШАЛГАРУУЛАЛТЫН ТАЛААР МЭДЭЭЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/28     12 УЛСЫН 78 ИРГЭНИЙГ АЛБАДАН ГАРГАВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28    

Xanadu Mines drills high-grade copper below current resource in Mongolia www.proactiveinvestors.com.au

Xanadu Mines Ltd (ASX:XAM) has successfully drilled extensions of high-grade copper along strike and below the current resource at the Stockwork Hill deposit within the Kharmagtai project in Mongolia.

The Stockwork Hill deposit consists of composite intrusions hosting gold-rich porphyry copper mineralisation circa 800 X 400 metres and extending to a depth of at least 600 metres.

Xanadu has now drilled a significant new zone of high-grade mineralisation outside the current resource (1.5 billion pounds copper and 2+ million ounces gold), returning:

- 294 metres at 0.47% copper and 0.85 g/t gold (1.01% copper equivalent) from 466 metres, including 86 metres at 0.78% copper and 1.91 g/t gold (2.0% copper equivalent) from 558 metres.

Significantly, the presence of bornite (an ore of copper) suggests this new zone of mineralisation is closer to the high-grade core of the system.

Further drilling is underway to expand this new zone by deepening several shallower holes above and along strike of the targets.

Andrew Stewart, managing director, commented: “We are excited that hole KHDDH419 successfully demonstrated a clear extension of high-grade mineralisation along strike and at depth outside the current resource model.

“We are particularly excited with the new results from this hole which has discovered a new zone of gold-rich copper porphyry mineralisation, representing the downthrown block of the main Stockwork Hill deposit.

“The high-grade extensions we have identified provide the opportunity to assess Stockwork Hill as a potential underground resource that has the potential to deliver significant additional value to the Project”.



Published Date:2017-10-30