1 SECURITIES TRADING REACHES MNT 1 TRILLION WWW.MONTSAME.MN PUBLISHED:2026/09/27      2 MINISTRIES MEET ICC DELEGATION WWW.UBPOST.MN PUBLISHED:2026/09/27      3 VERIFICATION DEMANDED OVER CITIZENSHIP OF CONTESTANT REPRESENTING MONGOLIA AT MISS GRAND INTERNATIONAL WWW.GOGO.MN PUBLISHED:2026/09/27      4 ULAANBAATAR DESIGNATES EIGHT SITES FOR AUTUMN TREE PLANTING WWW.GOGO.MN PUBLISHED:2026/09/27      5 OUTSTANDING BANK LOANS RISE 14.3 PERCENT WWW.MONTSAME.MN PUBLISHED:2026/09/24      6 CENTRAL ASIA AND MONGOLIA GROWTH TO REMAIN ROBUST WWW.EBRD.COM PUBLISHED:2026/09/24      7 A NEW OIL STORAGE FACILITY WITH A CAPACITY OF 16,000 CUBIC METERS HAS BEEN PUT INTO OPERATION IN MONGOLIA WWW.OPEN.KG PUBLISHED:2026/09/24      8 RUSSIA, MONGOLIA FORM WORKING GROUP TO EXAMINE FEASIBILITY OF A WESTERN RAIL CORRIDOR WWW.RUSSIASPIVOTTOASIA.COM PUBLISHED:2026/09/24      9 MONGOLIA SUBMITS CANDIDACY FOR UN SECURITY COUNCIL NON-PERMANENT SEAT FOR 2048–2049 WWW.MONTSAME.MN PUBLISHED:2026/09/24      10 ‘GASOLINE DISRUPTION MAY LAST 2 TO 3 YEARS’ WWW.UBPOST.MN PUBLISHED:2026/09/24      ЕРӨНХИЙ САЙД Н.УЧРАЛ ЯПОН УЛСАД АЛБАН ЁСНЫ АЙЛЧЛАЛ ХИЙХЭЭР МОРДЛОО WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     MININGWEEK 2026: НИЙТ ГАЗАР НУТГИЙНХАА 21 ХУВЬД АШИГТ МАЛТМАЛЫН ЛИЦЕНЗ ОЛГОХ БОЛОМЖТОЙ WWW.GOGO.MN НИЙТЭЛСЭН:2026/09/27     ДҮНЖИНГАРАВЫН УУЛЗВАРТ БОЛСОН ДЭЛБЭРЭЛТИЙН ХЭРГИЙГ НЭМЭЛТ МӨРДӨН БАЙЦААЛТ ХИЙЛГЭХЭЭР ПРОКУРОРТ БУЦААВ WWW.IKON.MN НИЙТЭЛСЭН:2026/09/27     “МОНГОЛЫН НОГООН, ХҮРТЭЭМЖТЭЙ ХОТУУД” ТӨСЛИЙГ ХЭРЭГЖҮҮЛЖ ЭХЭЛЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     АГААРЫН ТЭЭВРИЙН ХАМТЫН АЖИЛЛАГААГ ӨРГӨЖҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/09/27     26 МЯНГАН ХҮН УРГАЦ ХУРААЛТАД ОРОЛЦОЖ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/09/27     ШҮҮХЭЭС НАЙРУУЛАГЧ Б.БААТАРТ ХИЛИЙН ХОРИГ ТАВЬЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/09/26     "ХӨРӨНГӨ ОРУУЛАГЧДЫН ГОМДЛЫГ 30 ХОНОГТ ШИЙДВЭРЛЭХ ШИНЭ ЗОХИЦУУЛАЛТ ХЭРЭГЖИЖ ЭХЭЛСЭН" WWW.NEWS.MN НИЙТЭЛСЭН:2026/09/24     “МЯНГАД НАР” 19.8 МВТ-ЫН НАРНЫ ЦАХИЛГААН СТАНЦЫН ГҮЙЦЭТГЭЛ 40 ХУВЬТАЙ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/09/24     ГОВИЙН БҮСЭД ЗАРЛАСАН СЭРГЭЭГДЭХ ЭРЧИМ ХҮЧНИЙ АУКЦИОНД ГУРВАН КОМПАНИЙН ХАМТАРСАН ТҮНШЛЭЛ ШАЛГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/09/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Power for every stage of the mine lifecycle www.aggreko.com

Aggreko has supplied CITIC Pacific Mining with critical load-testing capacity along with a highly flexible, supplementary power package during the construction of the Sino Iron project, located at Cape Preston, 100 km south west of Karratha, Western Australia. The project is the largest magnetite mining and processing operation under construction in Australia. Aggreko supplied 12 MVA of loadbank capacity to test the power generation capability of the on-site gas-fired power plant. Once fully commissioned, the 450 MW power plant will provide power to the entire operations at the mine: including the processing plant, the specially built port and the living quarters of the mine’s employees.

Loadbanks are used during commissioning to test the precise power-generating capacity of a power plant before it goes into operation. In addition to load-testing, Aggreko supplied 2.5 MW of power that was used at different stages of the project. This included 1,600 kVA for the commissioning of the processing plant and 350 kVA to power the intake pump of the project’s desalination plant. A further 13 generators were utilised for the commissioning of the dewatering plant.
”Aggreko’s contribution to the Sino Iron project highlights our ability to deliver multi-faceted, fully customised and highly flexible power solutions to our customers,” commented Asterios Satrazemis, Managing Director, Aggreko Australia-Pacific. “Our ability to cope with the complexity and size of the project, along with the constantly evolving demands placed on our equipment, is a great endorsement of both our people and our fleet.” Once fully commissioned, the mine’s own 450 MW power plant would be used to provide power to everything from the mine’s very own port to the many processing facilities. Testing the load on the plant was critical, and our 14 load banks were up to the task.

Our back-up power helped CITIC Pacific tick all those other construction jobs off their list. With our help, they moved closer to the final commissioning of this massive magnetite ore mine.

To learn more about our products and services you may at our site www.aggreko.com or please contact us at Mongolia@aggreko.com or Begench.Turayev@aggreko.com for more information



Published Date:2018-12-13