1 MONGOLIA RECORDS USD 16.6 BILLION IN TRADE WWW.MONTSAME.MN PUBLISHED:2025/09/11      2 GOVERNMENT REPORTS OPERATIONAL IMPROVEMENTS AT ERDENES TAVANTOLGOI UNDER SPECIAL REGIME WWW.MONTSAME.MN PUBLISHED:2025/09/11      3 DIESEL LOCOMOTIVE CONVERTED TO HYBRID LOCOMOTIVE IN MONGOLIA WWW.RAILLYNEWS.COM  PUBLISHED:2025/09/11      4 MONGOLIA REVEALS ITS UNTAMED BEAUTY AND RICH CULTURE THROUGH THE EYES OF DUTCH TOURISTS ON AN UNFORGETTABLE ADVENTURE WWW.TRAVELANDTOURWORLD.COM  PUBLISHED:2025/09/11      5 ROBOTIC MILITARY DOG TRAINING FEATURED IN CHINA-RUSSIA-MONGOLIA BORDER DEFENSE EXERCISE WWW.NOVINITE.COM  PUBLISHED:2025/09/11      6 MONGOLIA DEPLOYS 15TH BATTALION’S SECOND CONTINGENT TO UN MISSION IN SOUTH SUDAN WWW.MONTSAME.MN PUBLISHED:2025/09/11      7 THE MONGOLZ RANKINGS RISE TO SECOND WORLDWIDE WWW.MONTSAME.MN PUBLISHED:2025/09/10      8 CHABOT MOBILITY JOINS MONGOLIA VOYAGER PROJECT TO EXPORT K-MOBILITY INFRASTRUCTURE WWW.BIZ.CHOSUN.COM  PUBLISHED:2025/09/10      9 "OYUT" COPPER DEPOSIT WITH 1.1 MILLION TONS OF PURE COPPER DISCOVERED WWW.GOGO.MN PUBLISHED:2025/09/10      10 CHINA-RUSSIA-MONGOLIA BORDER DEFENSE COOPERATION 2025 JOINT EXERCISE KICKS OFF WWW.ENG.CHINAMIL.COM.CN  PUBLISHED:2025/09/10      ЗАСГИЙН ГАЗРЫН WWW.D-GOV.MN ЦАХИМ СИСТЕМ ӨНӨӨДРӨӨС АЖИЛЛАЖ ЭХЭЛЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/09/11     ТӨМӨРТЭЙН ОВООНЫ ЦАЙРЫН ОРДЫН ТУСГАЙ ЗӨВШӨӨРЛИЙГ АЛБАН ТУШААЛТНУУД ХУВИЙН КОМПАНИДАА ШИЛЖҮҮЛЭН АВСАН ҮЙЛДЛИЙН УЛМААС ТӨРД УЧРУУЛСАН ХОХИРЛЫГ НЭХЭМЖЛЭХЭЭР БОЛОВ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/09/11     ТӨСВИЙН АЛДАГДАЛТАЙ АЛБАН ТУШААЛТНЫГ ЧӨЛӨӨЛНӨ WWW.NEWS.MN НИЙТЭЛСЭН:2025/09/11     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСӨЛД 2 ТЭРБУМААР ЗӨВЛӨХ ҮЙЛЧИЛГЭЭ АВНА WWW.NEWS.MN НИЙТЭЛСЭН:2025/09/11     ИПОТЕКИЙН БАНК БАЙГУУЛАГДАХААС ӨМНӨ САНХҮҮЖИЛТИЙГ ЗАСГИЙН ГАЗАР РУУ ШИЛЖҮҮЛНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/09/10     Р.ЧИНГИСИЙГ ДОТООДЫН ЦЭРГИЙН ЕРӨНХИЙ КОМАНДЛАГЧААР ТОМИЛНО WWW.NEWS.MN НИЙТЭЛСЭН:2025/09/10     БИРЖИЙН НҮҮРСНИЙ ЭКСПОРТ 739 МЯНГАН ТОНН БОЛЖ, ӨМНӨХ САРААС ХОЁР ДАХИН ӨСЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/09/10     “ЭРДЭНЭС ТАВАНТОЛГОЙ” ХК НҮҮРС БАЯЖУУЛАХ ҮЙЛДВЭРЭЭС ГАРЧ БУЙ ХАЯГДАЛ НҮҮРСИЙГ ДАХИН БОЛОВСРУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/09/10     ХАЛЗАН БҮРЭГТЭЙН ОРДЫН АСУУДЛААРХ СОНСГОЛД ХОВДООС 50 ХҮН ОРОЛЦУУЛАХ ХҮСЭЛТ ГАРГАЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/09/10     “УЛААНБАДРАХ 300 МВТ ЦАХИЛГААН СТАНЦ” ТӨСЛИЙН ТЭЗҮ-ИЙГ МЭРГЭЖЛИЙН ЗӨВЛӨЛӨӨР ХЭЛЭЛЦҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/09/10    

Massive coal conversion base removing old scars www.ecns.cn

The largest coal chemical operation in the Ningxia Hui autonomous region has launched a campaign to clean up more than 120 small and disorderly coal storage fields.

The Ningdong Energy and Chemical Industry Base, one of China's largest coal production bases and a coal-to-chemical industry base, is located close to Shaanxi province and the Inner Mongolia autonomous region, areas with large coal deposits.

Since last year, it has shut down 127 disorderly coal fields that occupied over 533 hectares. More than 2 million metric tons of coal has been cleaned and 90 percent of the construction above ground has been dismantled.

The coal fields were a major logistical base that stored coal from the local area and Inner Mongolia, and then loaded it onto trucks to send to local fire power plants, boilers and consumers in Yunnan and Jiangsu provinces. Annual turnover was 25 million tons, totaling 10 billion yuan ($1.5 billion).

Construction of the Ningdong Energy and Chemical Industry Base began in 2003 and is now home to around 130 enterprises. Gross industrial output value reached 117 billion yuan in 2017.

The fields, however, were poorly managed. Most never met environmental requirements. The decision to close them was resisted strongly by the coal field owners, who paid a hefty rent to the villages and created jobs for people living in the area.

"Money from the coal fields helped cover the medical and social insurance costs of the villagers. One of the villages received 4 million yuan a year for leasing out land to coal operators. Every family received a dividend of more than 5,000 yuan," said Yan Xinmin, an official with the base administration.

Yang Jia, general manager of Ningxia Xinwen Energy Technology Co, said he once had to hide from environmental inspectors because he did not have credentials to operate.

Yang was the first to shut down the old coal yard and move his business to a new coal field, a 133-hectare area at the southern part of the base.

Thirty-four companies have been chosen to move their coal storage facilities into the new coal field, which cost 600 million yuan to build.

Ma Sanqing, an official with the base administration, said the villagers will find new jobs and sources of income at the new field, becoming shareholders of a special service company.

"If we have 1,000 trucks every day, the management of the trucks, dining and cleaning services will generate 5 million yuan annually," Ma said.

Yang Fu, head of the Huiminxiang village, said, "It is a necessary step to clean up the old coal yards. We are planning to build parking lots, dining facilities, auto repair shops and other services."

Efforts are underway to clean the black slag and mud that have blocked flood discharge channels. Trees will be planted to restore greenery in the coal fields, Ma said.



Published Date:2019-03-19