1 PRESIDENT ISSUES DECREE ON DEVELOPING TRADITIONAL MONGOLIAN MEDICINE WWW.MONTSAME.MN PUBLISHED:2026/01/17      2 IN 2025, MONGOLIA EXPORTED 83.9 MILLION TONS OF COAL WWW.OPEN.KG PUBLISHED:2026/01/17      3 AYAN HOTELS AND RESORTS ANNOUNCES THE OPENING OF AYAN ZALAAT HOTEL & SPA IN ULAANBAATAR, MONGOLIA WWW. PUBLISHED:2026/01/17      4 PM: ONLY AN ORDERLY STATE CAN DELIVER ECONOMIC GROWTH TO CITIZENS WWW.MONTSAME.MN PUBLISHED:2026/01/16      5 JAPAN GRANT TO SUPPORT POWER GRID RELIABILITY WWW.MONTSAME.MN PUBLISHED:2026/01/16      6 MONGOLIA TO DEEPEN COOPERATION WITH CHINA IN THE FIELD OF RESPONSIBLE MINERAL EXTRACTION WWW.OPEN.KG PUBLISHED:2026/01/16      7 SPRING AIRLINES PLANS DIRECT SHANGHAI–ULAANBAATAR FLIGHTS WWW.MONTSAME.MN PUBLISHED:2026/01/16      8 DRIVING FINANCIAL INCLUSION IN MONGOLIA: INVESTMENT IN INVESCORE WWW.TRIODOS-IM.COM PUBLISHED:2026/01/15      9 ‘ERDENES TAVANTOLGOI’ JSC SETS ALL-TIME DAILY RECORD FOR COAL EXPORTS WWW.MONTSAME.MN PUBLISHED:2026/01/15      10 SOUTH KOREA JOINS CHINA, JAPAN, GERMANY, RUSSIA AND KAZAKHSTAN IN ACCELERATING MONGOLIA TOURISM BOOM WITH RECORD-BREAKING VISITOR SPEND, STRONG WINTER DEMAND AND RISING FOUR-SEASON TRAVEL APPEAL WWW.TRAVELANDTOURWORLD.COM PUBLISHED:2026/01/15      “ЧИНГИС ХААН” НИСЭХ БУУДЛЫГ ТҮШИГЛЭН ОЛОН УЛСЫН ТРАНЗИТ ЗОЧИД БУУДАЛ БАЙГУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/17     АТГ: Н.ТАВИНБЭХ ЗӨВЛӨХИЙНХӨӨ КОМПАНИД 7 ТЭРБУМ ТӨГРӨГИЙН САНХҮҮЖИЛТ ОЛГОСОН WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/17     С.НАРАНЦОГТЫН ЭХНИЙ НҮҮДЭЛ: ИРГЭДИЙН ЗЭЭЛИЙН ХЭМЖЭЭГ 5 ХУВИАР БУУРУУЛАХ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/17     АЛБАН БОЛОН ХУВИЙН ХЭРГЭЭР АМЬДРАХ ГАДААД ИРГЭДИЙН ТОО ӨСЧЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/17     ХЯТАДЫН ҮНДЭСНИЙ ГАЗРЫН ТОСНЫ КОРПОРАЦИТАЙ ШАТАХУУНЫ НИЙЛҮҮЛЭЛТИЙГ НЭМЭГДҮҮЛЭХ УРТ ХУГАЦААНЫ ГЭРЭЭ БАЙГУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/16     "СЭЛБЭ 20 МИНУТЫН ХОТ" БҮСЭД СОНГОН ШАЛГАРУУЛАЛТ ЗАРЛАЛАА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/16     2025 ОНД МОНГОЛ УЛС НИЙТ 90.2 САЯ ТОНН НҮҮРС ЭКСПОРТОЛЖ РЕКОРД ЭВДСЭН Ч ҮНЭ УНАСААР БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/16     МОНГОЛ УЛС ХЯТАД УЛСТАЙ ХАРИУЦЛАГАТАЙ НОГООН УУЛ УУРХАЙГ ХӨГЖҮҮЛЭХ ХАМТЫН АЖИЛЛАГААГАА ГҮНЗГИЙРҮҮЛНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/15     “ВИЗ МЭДҮҮЛЭГЧИД ВИЗИЙН МЭДҮҮЛГЭЭ БӨГЛӨН, ТОВЛОСОН ЦАГТАА ЯРИЛЦЛАГАДАА ОРНО” WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/15     БНХАУ-ТАЙ ХАМТРАН ХИЛ ОРЧМЫН БҮСЭД ГЕОЛОГИЙН СУДАЛГАА ХИЙХЭЭР БОЛЛОО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/15    

Oyu Tolgoi announces performance results for fourth quarter of 2019 www.montsame.mn

Ulaanbaatar /MONTSAME/. Today, February 12, Oyu Tolgoi CEO Armando Torres along with the company’s senior managers held a press briefing to introduce the performance results for the fourth quarter of 2019.

Some highlights of the Oyu Tolgoi mining project’s performance in 2019 are:

• Oyu Tolgoi continued its globally competitive safety performance

• Total in-country spend has passed US$10 billion

• US$321 million taxes paid and US$431 million on national procurement in 2019

• Maintains the guidance for copper production – 146,346 tons of copper in concentrate

• Exceeds 2019 full-year production guidance for gold – 241,840 ounces of gold in concentrate

• Completed the construction of primary production shaft (Shaft 2) of the underground mine

• Reached highest performance record for the underground lateral development

In 2019, Oyu Tolgoi continued to progress and deliver important milestones for the underground mine development and make a significant contribution to the Mongolian economy, passing U$10 billion of in-country spend.

Prioritizing and maintaining excellence in safety, Oyu Tolgoi’s All Injury Frequency Rate (AIFR) was 0.16 per 200,000 hours worked in 2019.

As of 31st of December 2019, over 93 per cent of Oyu Tolgoi’s workforce of 13,800 were Mongolian with more than half working on the development of the underground mine. Oyu Tolgoi provided 680,354 people-hours of training in 2019.

Within this scope, Oyu Tolgoi provided the internationally recognized and accredited training to its 348 employees in the last year in cooperation with Holmesglen, the registered training organization in Australia.

In 2019, Oyu Tolgoi paid US$321 million in taxes, fees and other payments and collaborated with 838 suppliers, 564 of which were Mongolian businesses which accounted for 76 percent of total operations procurement spend.

Partnership was a key priority in 2019, with Oyu Tolgoi contributing to public health, primary education, infrastructure and many other areas.

In terms of major infrastructure projects, the highlights were the opening of the Oyu Tolgoi-Khanbogd 35.1-km paved road, the opening of a new hospital in Mandal-Ovoo soum, and the completion of the fifth kindergarten in Umnugovi province, sponsored by the Oyu Tolgoi funded Gobi Oyu Development Support Fund.

Underground Development Update

Construction of the primary production shaft (Shaft 2) was completed in October 2019, which allows the movement of 300 people per cage cycle versus a maximum of 60 people per cage cycle through Shaft 1. Underground development materials will be lifted to surface via the Shaft 2 production hoist.

Productivity improvement measures resulted in increased underground lateral development rates during the fourth quarter, with an average rate of 1,607 equivalent meters (eqm) compared to 1,214 eqm in the third quarter, with December seeing a record of 1,809 eqm.

Construction is progressing on Shafts 3 and 4 with both collars now installed. Final preparations are now underway to enable commencement of main sinking operations for both shafts during the second quarter of 2020.

"We continue to expect to complete the mine design in the first half of 2020 and the Definitive Estimate of cost and schedule in the second half of 2020."

Production for fourth quarter of 2019

As anticipated, mined copper production from the open pit was eight per cent lower than 2018 as mining activity moved to lower grade areas. Grades were 11 per cent lower for the year reflected in the 21 per cent decline in fourth-quarter production, partly offset by productivity improvements.

Other highlights:

Full-year copper production in concentrate of 146,346 tons vs original guidance range of 125,000 – 155,000 tons in concentrate
Full-year mill throughput of 40,777,225 tons, an increase of 5 per cent over 2018
Full-year gold production in concentrate of 241,840 ounces vs original guidance range of 180,000 – 220,000 ounces in concentrate



Published Date:2020-02-12