1 MONGOLIA RECEIVES NATIONAL PRODUCTIVITY MASTER PLAN (2026–35) TO DRIVE PRODUCTIVITY-LED GROWTH, RESILIENCE, AND SHARED PROSPERITY WWW.GLOBALNEWSWIRE.COM PUBLISHED:2026/01/29      2 78 FOREIGN NATIONALS FROM 12 COUNTRIES DEPORTED FROM MONGOLIA WWW.GOGO.MN PUBLISHED:2026/01/29      3 JAPANESE MILITARY MAPS REVEAL FIRST LOOK AT THE HIDDEN GREAT MONGOLIAN ROAD WWW.INDIANDEFENCEREVIEW.COM PUBLISHED:2026/01/29      4 SILVER ELEPHANT ANNOUNCES FAVORABLE TAX TRIBUNAL RULING IN MONGOLIA WWW.INVESTINGNEWS.COM PUBLISHED:2026/01/29      5 MELTING RESERVES OF POWER: MONGOLIA’S GLACIERS AND THE FUTURE OF ENERGY AND FOOD SECURITY WWW.RELIEFWEB.INT PUBLISHED:2026/01/28      6 MONGOLIA CONSTRUCTION INDUSTRY REPORT 2025: OUTPUT TO GROW AT AN AAGR OF 4.3% BETWEEN 2026-2029, SUPPORTED BY INVESTMENTS IN TRANSPORTATION, ELECTRICITY, AND INFRASTRUCTURE - RESEARCHANDMARKETS.COM WWW.BUSINESSWIRE.COM PUBLISHED:2026/01/28      7 EMERGING CHANGES IN THE METHODS AND TACTICS OF HUMAN TRAFFICKING WWW.GOV.MN PUBLISHED:2026/01/28      8 MONGOLIA PLANS TO PRODUCE 90 MILLION TONS OF COAL THIS YEAR WWW.MONTSAME.MN PUBLISHED:2026/01/27      9 MINING SECTOR WEEK OPENS, PLANNED LEGAL REFORMS OUTLINED WWW.MONTSAME.MN PUBLISHED:2026/01/27      10 13 PEOPLE FREEZE TO DEATH IN MONGOLIA IN JANUARY WWW.XINHUANET.COM PUBLISHED:2026/01/27      МАНАЙ УЛС ДАХЬ ХАМГИЙН УРТ БУЮУ 12.6 КМ ДАМЖУУРГЫГ АШИГЛАЛТАД ОРУУЛЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/29     ББСБ-УУДЫН ХЭРЭГЛЭЭНИЙ БОЛОН ЦАХИМ ЗЭЭЛИЙН ДАВХАРДЛЫГ БУУРУУЛАХ ШИЙДВЭР ГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/29     НИСЭХ БУУДЛЫН ӨРГӨТГӨЛИЙГ ЯАРАЛТАЙ ЭХЛЭХ ШААРДЛАГАТАЙГ ДАХИН ТОДОТГОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/29     “ЗЭРЛЭГ АДУУГ ДАХИН НУТАГШУУЛАХ” ТӨСӨЛ ХЭРЭГЖИНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/29     МОНГОЛ УЛСЫН ГАДААД ПАСПОРТ ХҮЧИРХЭГ БАЙДЛААРАА 73-Т ЖАГСЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/29     АНУ-ЫН ХУДАЛДАА, ХӨГЖЛИЙН АГЕНТЛАГ МОНГОЛД 2.2 САЯ ДОЛЛАРЫН БУЦАЛТГҮЙ ТУСЛАМЖ ҮЗҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/29     ЗЭСИЙН БАЯЖМАЛЫН ҮЙЛДВЭРИЙН ТӨСЛИЙН ХАМТРАГЧИЙГ ЭНЭ ОНЫ I УЛИРАЛД ШАЛГАРУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/29     АЖ ҮЙЛДВЭРИЙН САЛБАРЫН НИЙТ ҮЙЛДВЭРЛЭЛ ӨМНӨХ ОНЫ МӨН ҮЕЭС 4.8 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28     ЗГ: ЗЭС ХАЙЛУУЛАХ ҮЙЛДВЭРИЙН СОНГОН ШАЛГАРУУЛАЛТЫН ТАЛААР МЭДЭЭЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/28     12 УЛСЫН 78 ИРГЭНИЙГ АЛБАДАН ГАРГАВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28    

Erdene Resource intersects 5.5 metres of 126 g/t in Mongolia www.resourceworld.com

Erdene Resource Development Corp. [ERD-TSX; ERDCF-OTC; ERDN-MSE] reported drill results from the Midfield Southeast Zone at the100%-owned Bayan Khundii gold project in southwest Mongolia.

“We are exceptionally pleased with drill results from the new Midfield Southeast Zone, including one metre of 582 g/t gold within an intersection of 5.5 metres grading 126 g/t gold, in a near-surface region of the Bayan Khundii deposit,” said Peter Akerley, President and CEO. “A second intersection, 40 metres north, of 15 metres of 26 g/t gold, including one metre grading 338 g/t gold, confirms the existence of a new high-grade zone in an area that is currently classified as waste or low-grade material that could add meaningfully to resources during the early stages of the project.

“While we are rapidly advancing the Bayan Khundii development, with results of the project’s bankable feasibility study anticipated in the coming weeks, over the past six months we have demonstrated the potential of the Khundii gold district, with high-grade intersections at Bayan Khundii and Altan Nar, and the discovery of the Dark Horse prospect,” Akerley continued. “Further results are forthcoming from recent work at Striker and Dark Horse, where multiple instances of visible gold were encountered. We are developing follow-up drilling campaigns, prioritizing near-mine expansion opportunities that are expected to add to our established resource base.”

Intersected 5.5 metres of 125.9 g/t gold, including one metre of 581.6 g/t gold, in BKD-288, beginning 11.5 metres downhole; drilled 15 metres of 25.6 g/t gold, including one metre of 338 g/t gold, beginning at 14.9 metres, in BKD-274, 40 metres north of BKD-288; intersected anomalous gold mineralization in 16 of 18 holes, all within 25 metres from the surface;

Interpreted as the intersection of the stacked northwest-trending quartz adularia veins, with a north-south-trending conceptual feeder structure; target area classified as waste or low-grade stockpile material in the current resource; projected to be mined in year one of the current mining schedule.

Erdene has a mining licence for the Bayan Khundii deposit and plans to start producing gold in late 2021.



Published Date:2020-07-09