1 MELTING RESERVES OF POWER: MONGOLIA’S GLACIERS AND THE FUTURE OF ENERGY AND FOOD SECURITY WWW.RELIEFWEB.INT PUBLISHED:2026/01/28      2 MONGOLIA CONSTRUCTION INDUSTRY REPORT 2025: OUTPUT TO GROW AT AN AAGR OF 4.3% BETWEEN 2026-2029, SUPPORTED BY INVESTMENTS IN TRANSPORTATION, ELECTRICITY, AND INFRASTRUCTURE - RESEARCHANDMARKETS.COM WWW.BUSINESSWIRE.COM PUBLISHED:2026/01/28      3 EMERGING CHANGES IN THE METHODS AND TACTICS OF HUMAN TRAFFICKING WWW.GOV.MN PUBLISHED:2026/01/28      4 MONGOLIA PLANS TO PRODUCE 90 MILLION TONS OF COAL THIS YEAR WWW.MONTSAME.MN PUBLISHED:2026/01/27      5 MINING SECTOR WEEK OPENS, PLANNED LEGAL REFORMS OUTLINED WWW.MONTSAME.MN PUBLISHED:2026/01/27      6 13 PEOPLE FREEZE TO DEATH IN MONGOLIA IN JANUARY WWW.XINHUANET.COM PUBLISHED:2026/01/27      7 MONGOLIA TO HOST AFC ASIAN CUP 2029 QUALIFIERS WWW.GOGO.MN PUBLISHED:2026/01/27      8 WHY DID MONGOLIA JOIN TRUMP’S BOARD OF PEACE? WWW.THEDIPLOMAT.COM PUBLISHED:2026/01/27      9 MONGOLIAN BANKING SECTOR'S NET EXTERNAL ASSETS DOWN 0.1 PCT IN DECEMBER 2025 WWW.XINHUANET.COM PUBLISHED:2026/01/27      10 KAZAKHSTAN, MONGOLIA REAFFIRM COMMITMENT TO BOOST TRADE TO $500 MILLION WWW.ASTANATIMES.COM PUBLISHED:2026/01/27      АЖ ҮЙЛДВЭРИЙН САЛБАРЫН НИЙТ ҮЙЛДВЭРЛЭЛ ӨМНӨХ ОНЫ МӨН ҮЕЭС 4.8 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28     ЗГ: ЗЭС ХАЙЛУУЛАХ ҮЙЛДВЭРИЙН СОНГОН ШАЛГАРУУЛАЛТЫН ТАЛААР МЭДЭЭЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/28     12 УЛСЫН 78 ИРГЭНИЙГ АЛБАДАН ГАРГАВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/28     “ХОГ ШАТААЖ, ЭРЧИМ ХҮЧ ҮЙЛДВЭРЛЭХ” ТӨСЛИЙН ГАЗАР ЧӨЛӨӨЛӨЛТ 71 ХУВЬТАЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/27     ОНЫ ЭХНИЙ ХАГАС ГЭХЭД АЛТ ТУШААЛТЫГ 20-30 ХУВИАР НЭМЭГДҮҮЛНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/27     ХАВРЫН ЧУУЛГАНААР АМНАТ ТООЦОХ АРГАЧЛАЛЫГ ШИНЭЧИЛНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/27     БАГАНУУРЫГ ТҮШИГЛЭН БАРИХ ШИНЭ ҮЙЛДВЭРТ 40МВТ-ИЙН ЭРЧИМ ХҮЧ ҮЙЛДВЭРЛЭНЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/27     МАНАЙ УЛС ЭНЭ ОНД НҮҮРС 90 САЯ, ЗЭС 1.9 САЯ ТОННЫГ ОЛБОРЛОХООР ТӨЛӨВЛӨЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/27     УИХ-ЫН ДАРГА Н.УЧРАЛ АЛБАН ЁСНЫ АЙЛЧЛАЛАА ОХУ-ААС ЭХЭЛНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/27     ИХ ХЭМЖЭЭНИЙ ЭМ ХУУЛЬ БУСААР ХАДГАЛСАН ХЭРГИЙГ ШАЛГАЖ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/27    

Ivanhoe, Gecamines kick off construction at Kipushi zinc mine in DRC www.mining.com

Canada’s Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) and Congo’s state mining company Gécamines have begun construction activities at the historic Kipushi underground zinc-copper mine, which they plan returning to production by late 2024.
In a breaking-ground ceremony, the companies’ joint venture, Kipushi Corporation, said pre-production capital costs, including contingency, was estimated at $382 million.
It noted that the use of existing, rehabilitated surface and underground infrastructure would allow the JV to keep costs relatively low while taking two years to reach production.
“Kipushi is exceptional, not only because of the renowned Big Zinc deposit, which is one of the world’s richest orebodies, but more importantly because of the people of Kipushi and the unique partnerships that make today’s ceremony possible,” Ivanhoe Mines’ president, Marna Cloete, said in a statement.
The Kipushi 2022 feasibility study envisions an 800,000-tonne-per-annum concentrator and underground mine, producing an average of 240,000 tonnes of zinc anually over a 14-year mine life.
The companies said that once in production, Kipushi would be the world’s highest-grade major zinc mine, with an average head grade of 36.4% over the first five years of production.
Ivanhoe, Gecamines kick off construction at Kipushi zinc mine in DRC
Jean-Michel Sama Lukonde, Prime Minister of the DRC (right) and the government delegation were welcomed by Marna Cloete, President of Ivanhoe Mines (centre), and Louis Watum, General Manager of Kipushi Corporation (left).
At a zinc price of $1.40 per pound, the after-tax net present value (NPV) at an 8% real discount rate is $1.4 billion, with an after-tax real internal rate of return (IRR) of 54%. The current spot zinc price is $1.46 per pound.
Ivanhoe has also signed a memorandum of understanding (MOU) with the provincial government of Haut-Katanga to study options for upgrading the DRC-Zambia border crossing, in the town of Kipushi, for commercial imports and exports.
The plan is to build a dedicated, commercial border post for the Kipushi mine and upgrade the existing one in the town of Kipushi, which currently only serves local traffic between DRC and Zambia.
The mine has a long and storied history as a major producer of copper and zinc. Built and then operated by Union Minière for 42 years, it began mining a reported 18% copper deposit from a surface open pit in 1924. It was the world’s richest copper mine at the time.
Kipushi then transitioned to become Africa’s richest underground copper, zinc and germanium mine. Gécamines gained control of the mine in 1967 and operated it until 1993, when it was placed on care and maintenance due to a combination of economic and political factors.


Published Date:2022-09-13