1 DEMOCRATIC PARTY GROUP NOT TO ATTEND PARLIAMENTARY SESSIONS UNTIL SPEAKER N.UCHRAL RESIGNS WWW.GOGO.MN PUBLISHED:2026/03/16      2 TMK ENERGY HITS RECORD GAS FLOW AT MONGOLIAN CSG PILOT WWW.TIPRANKS.COM PUBLISHED:2026/03/16      3 MONGOLIA WILL PURCHASE 100% OF PETROLEUM PRODUCTS FROM RUSSIA — STATED THE DEPUTY MINISTER WWW.OPEN.KG PUBLISHED:2026/03/16      4 TAX REFORM PACKAGE TO REDUCE TAX BURDEN BY MNT 2.7 TRILLION WWW.MONTSAME.MN PUBLISHED:2026/03/16      5 EU–MONGOLIA COOPERATION ON GREEN, SUSTAINABLE INVESTMENT STRENGTHENS WWW.MONTSAME.MN PUBLISHED:2026/03/16      6 OYU TOLGOI MANAGEMENT FEE REDUCTION TALKS TO BE FINALIZED IN MARCH WWW.MONTSAME.MN PUBLISHED:2026/03/16      7 MONGOLIA, U.S. TO MARK 40TH ANNIVERSARY OF DIPLOMATIC RELATIONS NEXT YEAR WWW.MONTSAME.MN PUBLISHED:2026/03/16      8 'KHURDAN' SERVICE POINTS DELIVER GOVERNMENT SERVICES IN 31 COUNTRIES WWW.MONTSAME.MN PUBLISHED:2026/03/16      9 MONGOLIA TOPS CHESS GENDER EQUALITY INDEX WWW.MONTSAME.MN PUBLISHED:2026/03/16      10 MONGOLIA’S ORKHON VALLEY AMONG CNN’S ‘BEST PLACES TO VISIT IN 2026’ WWW.HERALDNEWS.COM PUBLISHED:2026/03/16      ТРАССТ ӨРТӨЖ БУЙ ГАЗАР АШИГЛАГЧДЫН ГАЗАР АШИГЛАХ ЭРХИЙГ ХЭСЭГЧЛЭН ЦУЦАЛНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/16     "УЛААНБААТАР МЕТРО"-НЫ БАРИЛГА УГСРАЛТЫН ГҮЙЦЭТГЭГЧИЙГ ШАЛГАРУУЛАХ ТЕНДЕРИЙГ 07.03-НД НЭЭНЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/16     ЖУУЛЧДЫН ТОО ӨНГӨРСӨН ЖИЛЭЭС 38,6 ХУВИАР ӨСЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/16     ХАЯГДАЛ УС ДАХИН БОЛОВСРУУЛАХ ҮЙЛДВЭР АШИГЛАЛТАД ОРЛОО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/16     ТӨГРӨГИЙН ХАДГАЛАМЖ 4.4 ИХ НАЯД ТӨГРӨГӨӨР НЭМЭГДЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/16     БОДИТ ЦАЛИНГИЙН ИНДЕКС ӨМНӨХ УЛИРЛААС 3.9 ХУВИАР ӨСЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/16     "Н.УЧРАЛ АЛБАН ТУШААЛАА ӨГӨХ ХҮРТЭЛ ЧУУЛГАНЫ ХУРАЛДААНД ОРОЛЦОХГҮЙ" WWW.NEWS.MN НИЙТЭЛСЭН:2026/03/16     У.ХҮРЭЛСҮХ: УИХ-ЫН ГИШҮҮНИЙГ ЭГҮҮЛЭН ТАТАХ ХУУЛИЙН ТӨСЛИЙГ ДЭМЖИН БАТАЛНА ГЭДЭГТ НАЙДАЖ БАЙНА НИЙТЭЛСЭН:2026/03/16     ХАВРЫН ЧУУЛГАНААР ХЭЛЭЛЦЭХ 32 ХУУЛИЙН ТӨСӨЛТЭЙ ТАНИЛЦ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/16     ДАЛАНЗАДГАД ХОТЫГ ТАВАНТОЛГОЙ-ГАШУУНСУХАЙТ ЧИГЛЭЛИЙН ТӨМӨР ЗАМТАЙ ХОЛБОХ ТӨСЛИЙН ЗУРАГ ТӨСӨЛ, ТЭЗҮ-ИЙГ ХАМТРАН БОЛОВСРУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/16    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Ivanhoe, Gecamines kick off construction at Kipushi zinc mine in DRC www.mining.com

Canada’s Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) and Congo’s state mining company Gécamines have begun construction activities at the historic Kipushi underground zinc-copper mine, which they plan returning to production by late 2024.
In a breaking-ground ceremony, the companies’ joint venture, Kipushi Corporation, said pre-production capital costs, including contingency, was estimated at $382 million.
It noted that the use of existing, rehabilitated surface and underground infrastructure would allow the JV to keep costs relatively low while taking two years to reach production.
“Kipushi is exceptional, not only because of the renowned Big Zinc deposit, which is one of the world’s richest orebodies, but more importantly because of the people of Kipushi and the unique partnerships that make today’s ceremony possible,” Ivanhoe Mines’ president, Marna Cloete, said in a statement.
The Kipushi 2022 feasibility study envisions an 800,000-tonne-per-annum concentrator and underground mine, producing an average of 240,000 tonnes of zinc anually over a 14-year mine life.
The companies said that once in production, Kipushi would be the world’s highest-grade major zinc mine, with an average head grade of 36.4% over the first five years of production.
Ivanhoe, Gecamines kick off construction at Kipushi zinc mine in DRC
Jean-Michel Sama Lukonde, Prime Minister of the DRC (right) and the government delegation were welcomed by Marna Cloete, President of Ivanhoe Mines (centre), and Louis Watum, General Manager of Kipushi Corporation (left).
At a zinc price of $1.40 per pound, the after-tax net present value (NPV) at an 8% real discount rate is $1.4 billion, with an after-tax real internal rate of return (IRR) of 54%. The current spot zinc price is $1.46 per pound.
Ivanhoe has also signed a memorandum of understanding (MOU) with the provincial government of Haut-Katanga to study options for upgrading the DRC-Zambia border crossing, in the town of Kipushi, for commercial imports and exports.
The plan is to build a dedicated, commercial border post for the Kipushi mine and upgrade the existing one in the town of Kipushi, which currently only serves local traffic between DRC and Zambia.
The mine has a long and storied history as a major producer of copper and zinc. Built and then operated by Union Minière for 42 years, it began mining a reported 18% copper deposit from a surface open pit in 1924. It was the world’s richest copper mine at the time.
Kipushi then transitioned to become Africa’s richest underground copper, zinc and germanium mine. Gécamines gained control of the mine in 1967 and operated it until 1993, when it was placed on care and maintenance due to a combination of economic and political factors.


Published Date:2022-09-13