1 OYU TOLGOI SAYS DIVIDENDS WILL BEGIN IN 2027 WWW.MONTSAME.MN PUBLISHED:2026/11/11      2 ULAANBAATAR TO CUT MUNICIPAL TAX RATE ON SERVICES FROM 2% TO 1% WWW.MONTSAME.MN PUBLISHED:2026/11/11      3 ALASKA GUARDSMEN, MONGOLIAN FIRST RESPONDERS CONQUER RUGGED TERRAIN DURING UVS 2026 DISASTER RESPONSE EXERCISE WWW.AK.NG.MIL PUBLISHED:2026/11/11      4 PGL ANNOUNCES 2027 $1 MILLION TOURNAMENT IN MONGOLIA WWW.DUST2.US PUBLISHED:2026/11/11      5 STATE FLAG RAISED, NINE WHITE BANNERS DISPLAYED TO MARK CHINGGIS KHAAN’S BIRTH ANNIVERSARY WWW.MONTSAME.MN PUBLISHED:2026/11/11      6 MONGOLIAN ACADEMY OF SCIENCES RECEIVES THE ORDER OF CHINGGIS KHAAN WWW.MONTSAME.MN PUBLISHED:2026/11/11      7 CABINET TO DISCUSS WHISTLEBLOWER PROTECTION AMONG 20 AGENDA ITEMS WWW.MONTSAME.MN PUBLISHED:2026/11/11      8 TRUMP-BACKED CRITICAL MINERALS DEALS FACE GROWING PRESSURE AFTER BLUE WAVE WWW.BLOOMBERG.COM PUBLISHED:2026/11/09      9 TDB INVESTS USD 30 MILLION IN A THREE-YEAR TECHNOLOGY TRANSFORMATION WWW.MONTSAME.MN PUBLISHED:2026/11/09      10 MONGOLIA, US DISCUSS EXPANDING COOPERATION IN VOCATIONAL EDUCATION WWW.MONTSAME.MN PUBLISHED:2026/11/09      ХҮННҮ ХОТЫН ДЭД БҮТЦИЙГ БАРЬЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/11     "АВЛИГА АЛБАН ТУШААЛ, ТӨРИЙН ӨМЧ ХӨРӨНГӨ, ТӨСӨВТЭЙ ХОЛБООТОЙ ЗҮЙЛИЙГ БАРИМТАД ТУЛГУУРЛАН ШҮГЭЛ ҮЛЭЭСЭН БОЛ ГҮТГЭХ ГЭМТ ХЭРЭГТ ХАМААРАХГҮЙ" WWW.IKON.MN НИЙТЭЛСЭН:2026/11/11     ИНФЛЯЦ АРАВДУГААР САРД 13.4 ХУВЬТАЙ ГАРЧ, ЭНЭ ОНЫ ХАМГИЙН ӨНДӨР ТҮВШИНД ХҮРЛЭЭ WWW.IKON.MN НИЙТЭЛСЭН:2026/11/11     ЕСӨН УЛСЫН 129 ИРГЭНИЙГ МОНГОЛ УЛСААС АЛБАДАН ГАРГАЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/11     ЕС, АРАВДУГААР САРД УЛСЫН ХЭМЖЭЭНД ДӨРВӨН ИРГЭН СУРАГГҮЙ АЛГА БОЛЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/11     РИО ТИНТО 2027 ОНД ОЮУ ТОЛГОЙГООС НОГДОЛ АШИГ ХУВААРИЛНА ГЭДГЭЭ БАТЛАВ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/11     ДУЛААН ГАРААШИЙГ ТАТВАРААС ЧӨЛӨӨЛӨХ ХУУЛИЙН ТӨСЛИЙГ ЗАСГИЙН ГАЗАР ДЭМЖЛЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/11     УЛААНБААТАР ХОТЫН ЗУРГААН ТӨРЛИЙН ТАТВАРЫГ 50 ХУВЬ БУУРУУЛАХ ХОТЫН ДАРГЫН САНААЧИЛГЫГ НИТХ ДЭМЖЛЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/09     “ЭРДЭНЭС ТАВАНТОЛГОЙ” ХК НЭГ ИХ НАЯД ТӨГРӨГИЙН НООГДОЛ АШИГ ТӨВЛӨРҮҮЛЭВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/11/09     100 САЯАС ДЭЭШ ХАХУУЛЬ АВБАЛ БҮХ НАСААР ХОРИХ САНАЛЫГ 100 МЯНГАН ИРГЭН ДЭМЖЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/09    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Azzuro Resources Identifies Nine New Anomalies at Oval Cu-Ni-PGE Project in Mongolia www.kalkine.com.au

Azzuro Resources PLC (ASX:AZ9) has disclosed results from its first-stage 3D induced polarisation survey at the Oval Cu-Ni-PGE project on the Yambat tenement in southwestern Mongolia, identifying nine new anomaly trends including five priority-1 targets around the Oval intrusive body.

Key Points
Nine new resistivity anomalies identified around the Oval intrusive body from first-stage 3D IP survey results
Five priority-1 targets (Ta-01 to Ta-05) defined, each supported by coincident chargeability, low-resistivity and magnetic-constrained model data
A new Novaminex DHEM system has been imported into Mongolia and is being calibrated at the Red Hill project, with surveys planned over the Oval Cu-Ni area in September
The 3D IP survey is expected to be completed in Q3 2026, with further results to be reported
Priority-1 and Priority-2 Target Details at Oval
The five priority-1 targets — designated Ta-01 through Ta-05 — are each supported by coincident magnetics, resistivity and chargeability data. Ta-01 is located southeast of the Oval intrusion, beneath and beyond drillhole OVD0522, extending the geophysical interpretation into an area at depth not previously tested by drilling. Ta-02, Ta-03, Ta-04 and Ta-05 occur at shallow depth, are oriented sub-parallel to the Oval intrusion and are described as drill-ready. Ta-05 is spatially coincident with a previously defined south FLEM plate. Four priority-2 targets — Ta-06, Ta-07, Ta-08 and Ta-09 — were also identified, supported by two of the three geophysical datasets.

Historical Drilling Context at Oval Cu-Ni Project
According to the filing, previous drilling at the Oval project demonstrated that low-resistivity responses can be associated with mineralised mafic-ultramafic intrusion. Drillhole OVD049 was designed to test a low-resistivity anomaly and intersected 23 metres of mineralised mafic-ultramafic intrusion, including 16.8 metres at 0.39% copper and 0.41% nickel. The magnetic-constrained model applied to the new targets was completed in August 2026 by Terra Resources Pty Ltd, identifying a new magnetic anomaly extending from the western side of the Gossan zone towards North Oval, an area described as previously untested.

Next Steps and DHEM System Deployment
The company disclosed that it will continue and complete the 3D IP survey at Oval, with the programme expected to finish in Q3 2026. Following completion of downhole electromagnetic measurements using the new Novaminex DHEM system, the company said it will refine priority drill targets within the southern and southeastern extent of the Oval system. Planning of a drilling programme at the Oval Cu-Ni project is also listed as a next step. The company also disclosed it will continue integrating the constrained magnetic model from Terra Resources Pty Ltd with 3D IP interpretation, FLEM survey results and existing geological and drilling datasets.



Published Date:2026-09-07