1 MONGOLIA, REPUBLIC OF KOREA AND AUSTRALIA DOMINATE ON DAY 4 OF FIBA 3X3 ASIA CUP 2026 WWW.FIBA.BASKETBALL PUBLISHED:2026/04/05      2 PRIME MINISTER UCHRAL APPOINTS NEW CABINET MEMBERS WWW.MONTSAME.MN PUBLISHED:2026/04/05      3 ULAANBAATAR TO PROVIDE FREE LPG HEATING SYSTEMS TO INSULATED HOUSEHOLDS WWW.MONTSAME.MN PUBLISHED:2026/04/05      4 PARLIAMENT ELECTS BYAMBATSOGT AS SPEAKER WWW.MONTSAME.MN PUBLISHED:2026/04/05      5 PENSION RESERVE FUND ASSETS INCREASE BY MNT 2.7 BILLION WWW.MONTSAME.MN PUBLISHED:2026/04/03      6 TENDER FOR ‘FIRST RING PROJECT’ CONTRACTOR ANNOUNCED WWW.MONTSAME.MN PUBLISHED:2026/04/03      7 GROUNDWATER EXPLORATION TO BE CONDUCTED AT 25 LOCATIONS IN DORNOGOBI AIMAG WWW.MONTSAME.MN PUBLISHED:2026/04/03      8 TECH COMPANIES MUST END COMPLICITY IN ONLINE REPRESSION OF MONGOLIAN CULTURE WWW.TECHPOLICY.PRESS PUBLISHED:2026/04/03      9 MONGOLIA HAS ITS FIRST LUXURY HOTEL. IT WAS WORTH THE WAIT WWW.FORBES.COM PUBLISHED:2026/04/03      10 N.UCHRAL: SOME MINISTERS MAY BE RETAINED BASED ON PERFORMANCE WWW.GOGO.MN PUBLISHED:2026/04/02      МОНГОЛБАНК III САРД 949.5 КГ ҮНЭТ МЕТАЛЛ ХУДАЛДАН АВЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/05     ЦӨЛЖИЛТТЭЙ ТЭМЦЭХ НҮБ-ЫН COP17 ХУРЛЫН БЭЛТГЭЛ АЖИЛ ТӨЛӨВЛӨГӨӨНИЙ ДАГУУ ҮРГЭЛЖИЛЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/04/05     ДИЗЕЛЬ ТҮЛШ САР ХҮРЭХГҮЙН НӨӨЦТЭЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/05     УИХ-ЫН 15 ДАХЬ ДАРГААР С.БЯМБАЦОГТЫГ СОНГОЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/05     “ОЮУ ТОЛГОЙ” КОМПАНИАС УСТАЙ ХОЛБООТОЙ МЭДЭЭЛЭЛД ХҮРГҮҮЛЖ БУЙ ТАЙЛБАР, ТОДРУУЛГА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/03     ГАДААД ВАЛЮТЫН НӨӨЦ 7.2 ТЭРБУМ АМ.ДОЛЛАРТ ХҮРЭВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/03     ОНЦГОЙ АЛБАН ТАТВАРЫН ТУХАЙ ХУУЛЬД ӨӨРЧЛӨЛТ ОРУУЛАХ ТУХАЙ ХУУЛИЙН ТӨСЛИЙГ АНХНЫ ХЭЛЭЛЦҮҮЛЭГТ ШИЛЖҮҮЛЭВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/03     ЭРДЭНЭС МОНГОЛ: СТРАТЕГИЙН ОРДОД ХАМААРАХ ТӨСӨЛ, ХӨТӨЛБӨРИЙГ ЭРЭМБЭЛЖ ЭРЧИМЖҮҮЛНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/03     Н.УЧРАЛ: ЗАСГИЙН ГАЗАРТ ЭРХ ОЛГОВОЛ ШАТАХУУНЫ ҮНИЙГ ШУУРХАЙ ЗОХИЦУУЛАХ БОЛОМЖ БҮРДЭНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/04/02     БҮСЭЭ ЧАНГАЛАХ ЦАГ ИРЛЭЭ: ШАТАХУУНЫ ҮНИЙН ӨСӨЛТ БАРААНЫ ҮНЭД НӨЛӨӨЛНӨ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/02    

ОМТ

ОМТ designs, manufactures and supplies equipment for mining and transportation of coal, support and control of roof in flat seams with thickness between 0,8 m to 6,0 m and in seams with thickness between 6,0 m to 12,0 m working with top layer caving; roadways and main belt conveyors for operation in underground conditions and on the surface; sorting and loadings coal systems; other mechanization systems for the mines construction and non-standard metal fabrications.

ОМТ undertakes design of brand new and upgrades of existing mining equipment, including longwalls, taking into account specific geology and mining conditions actual mining operations.