1 PROCUREMENT AND CONSTRUCTION OF PREMIUM NEW DISTRIBUTION CENTER (EOI ANNOUNCEMENT) WWW.MONTSAME.MN PUBLISHED:2025/10/10      2 SIGNING OF GRANT AGREEMENT WITH MONGOLIA:CONTRIBUTING TO STRENGTHENING THE FOUNDATION FOR DEVELOPING ENGINEERS THROUGH A JAPANESE-STYLE PRACTICAL TRAINING FACILITY AND EQUIPMENT WWW.JICA.GO.JP PUBLISHED:2025/10/10      3 PETRO MATAD SHARES SURGE AFTER MONGOLIA TESTS ‘EXCEEDED EXPECTATIONS’ WWW.UKINVESTORMAGAZINE.CO.UK PUBLISHED:2025/10/09      4 ULAANBAATAR TO SUPPLY 170,000 HOUSEHOLDS WITH SEMI-COKE BRIQUETTES WWW.MONTSAME.MN PUBLISHED:2025/10/09      5 100.9 KILOMETERS OF ROADS UPGRADED IN ULAANBAATAR THIS YEAR WWW.MONTSAME.MN PUBLISHED:2025/10/09      6 ADVISED TO MANAGE STRATEGIC MINERAL RESOURCES PRUDENTLY WWW.MONTSAME.MN PUBLISHED:2025/10/09      7 30 KILOMETERS OF RAINWATER DRAINAGE PIPELINES TO BE INSTALLED IN 2026 WWW.MONTSAME.MN PUBLISHED:2025/10/09      8 ARCHAEOLOGISTS USE INNOVATIVE TECHNOLOGIES IN SEARCH FOR GENGHIS KHAN'S TOMB WWW.BGNES.COM PUBLISHED:2025/10/09      9 MONGOLIA BUILDS AWARENESS OF UN WATER CONVENTION WITH A VIEW TO STRENGTHENING TRANSBOUNDARY WATER COOPERATION WWW.UNECE.ORG PUBLISHED:2025/10/09      10 CHINA-EUROPE FREIGHT TRAINS PASSING THROUGH CENTRAL CORRIDOR TOP 3,000, 39 DAYS AHEAD OF 2024 WWW.GLOBALTIMES.CN PUBLISHED:2025/10/09      ЕВРОПЫН ХОЛБОО БОЛОН МОНГОЛ УЛСЫН БИЗНЕС, ХӨРӨНГӨ ОРУУЛАЛТЫН ФОРУМ БОЛНО WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/10     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСӨЛ 38 ХУВИЙН ГҮЙЦЭТГЭЛТЭЙ ҮРГЭЛЖИЛЖ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2025/10/10     МОНГОЛООС 20 САЯАР АВДАГ ШОНХОР ШУВУУ САУДЫН АРАБД 622 САЯ ТӨГРӨГӨӨР ЗАРАГДЛАА WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/09     АЗИЙН ХӨГЖЛИЙН БАНКНААС ЗЭЭЛ АВЧ 31 СУРГУУЛЬ, 9 ЦЭЦЭРЛЭГ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     Д.ЦОЛМОНГ ОЮУ ТОЛГОЙ ХХК-ИЙН ТУЗ-ИЙН ГИШҮҮНЭЭР ТОМИЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     Б.ЭНХБАЯРЫГ ХЗДХ-ИЙН САЙДААР ТОМИЛОХ ТАНИЛЦУУЛГЫГ ХОЙШЛУУЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/09     ХАГАС КОКСОН ШАХМАЛ ТҮЛШИЙГ ӨНӨӨДРӨӨС БОРЛУУЛЖ ЭХЭЛЛЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     МОНГОЛЫН ЭДИЙН ЗАСАГТ ТУЛГАРЧ БУЙ ЭРСДЭЛИЙГ ОЛОН УЛСЫН БАЙГУУЛЛАГУУД ИНГЭЖ ТОДОРХОЙЛОВ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/08     ЕРӨНХИЙЛӨГЧ У.ХҮРЭЛСҮХИЙН ЭНЭТХЭГТ ХИЙХ АЙЛЧЛАЛ НЬ СТРАТЕГИЙН ТҮНШЛЭЛИЙГ ДАХИН ТОДОРХОЙЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/08     "ОЮУ ТОЛГОЙ" ХХК-ИЙН ТУЗ-ИЙН ГИШҮҮНЭЭС Э.БАЯСГАЛАНГ ЧӨЛӨӨЛЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/08    

Ceramic Knife Gate Valve, ceramic lined knife gate valve

Price: 1000-5000USD/set

FREE-Valves Ceramic Knife Gate Valves are known as slurry gate valves. Its have simple structure and can cut off medium which contains solid particles and fibers, but for some very hard particles or serious erosive mediums, general metal seated knife gate valves will be washed out easily, so ceramic knife gate valves are very suitable for those mediums containing  fibers and hard solid particles.

Features:

1) Short  length of structure,saving material ,lightweight ,easy to install,small space occupation.

2) Seat is designed with single seat type to prevent sticking and accumulation of ash residue.

3) The sealing surface is made of structure ceramic with abrasion resistance and long service life.

Technical Specification:

1) Size Range: NPS2~NPS24,DN50~DN600

2) Pressure Range: Class 150 /PN6 /PN10

3) Applicable Temperature.: 0~200℃

4) Connection Type: Flange , wafer

5) Sealing material: engineering ceramics

6) Body Material: WCB, CF8, CF8M, CF3M

7) Pressure test:GB/T13927, API598

8) Face to Face: GB/T12221, API609

9) Valve body : GB/T12224,ASME B16.34

Operating Mode: Manual/Electric/Pneumatic

Application:

FREE-Valve’s Ceramic Knife Gate Valves are suitable for the conveying system with liquid-solid or gas -solid two-phrase medium , such as ash, mine residue and coal residue in iron and steel plant or ash conveying system of power plant , paper pulp in paper industry, sewage and slurry  in decontamination plant ,especially useful for the heavy medium system of coal mill.