1 FMO LEADS $172M LOAN TO MONGOLIA'S KHAN BANK AS DFIS PILE IN WWW.APP.DEALROOM.CO PUBLISHED:2026/11/05      2 GOLD MINES IN MONGOLIA: IS THE AMBITION TO BECOME A MODEL ACHIEVABLE? OUR FIELD INVESTIGATION WWW.LUXURYTRIBUNE.COM PUBLISHED:2026/11/05      3 MONGOLIA’S PRESIDENT FACES ACCUSATIONS OF SILENCING HIS POLITICAL RIVALS WWW.INTPOLICYDIGEST.ORG PUBLISHED:2026/11/05      4 OYU TOLGOI RESUMES NORMAL COPPER CONCENTRATE EXPORTS WWW.MONTSAME.MN PUBLISHED:2026/11/05      5 MONGOLIA, WORLD BANK DISCUSS AIRPORT AND ROAD DEVELOPMENT PROJECTS WWW.MONTSAME.MN PUBLISHED:2026/11/05      6 LAND-USE RIGHTS IN PROTECTED AREAS TO BE GRANTED THROUGH OPEN SELECTION WWW.MONTSAME.MN PUBLISHED:2026/11/05      7 MPS SUPPORT PROPOSAL TO PROHIBIT USE OF CHINGGIS KHAAN'S PORTRAIT ON ALCOHOL AND TOBACCO PRODUCTS WWW.MONTSAME.MN PUBLISHED:2026/11/05      8 $712 BILLION WIPED OFF WORLD’S BIGGEST MINING COMPANIES SINCE START OF IRAN WAR WWW.MINING.COM PUBLISHED:2026/11/04      9 MONGOLIA’S NEWBORN BABY NUMBERS FALL BY 3.9 PERCENT WWW.NEWS.MN PUBLISHED:2026/11/04      10 MONGOLIA STRENGTHENS MULTISECTORAL ACTION TO ACCELERATE CLEAN HOUSEHOLD ENERGY TRANSITION WWW.MONTSAME.MN PUBLISHED:2026/11/04      “ТУСГАЙ ХАМГААЛАЛТТАЙ ГАЗРЫГ СОНГОН ШАЛГАРУУЛАЛТААР АШИГЛУУЛДАГ БОЛНО" WWW.NEWS.MN НИЙТЭЛСЭН:2026/11/05     МОНГОЛ УЛСЫН 43 ИРГЭН ХАР ТАМХИНЫ ХЭРГЭЭР ГАДААДАД ЯЛ ЭДЭЛЖ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/05     “ЭРДЭНЭС ТАВАНТОЛГОЙ” ХК, “ЧАЛКО” КОМПАНИ ХАМТЫН АЖИЛЛАГААНЫ САНАМЖ БИЧИГ БАЙГУУЛЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/05     “СҮХБААТАР ДУЛААНЫ ЦАХИЛГААН СТАНЦ” 150 МЯНГАН ӨРХ, АЖ АХУЙН НЭГЖИЙГ ЦАХИЛГААНААР, 30 МЯНГАН АЙЛ ӨРХИЙГ ДУЛААНААР ХАНГАНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/05     “100 МЯНГАН АЙЛЫН ОРОН СУУЦ” ХӨТӨЛБӨРИЙГ 2027-2030 ОНД ХЭРЭГЖҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/05     БАЙДРАГИЙН УЦС-ЫН ТӨСЛИЙН ХУВИЙН ХЭВШЛИЙН ТҮНШЛЭГЧИЙГ СОНГОН ШАЛГАРУУЛНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/05     АВТО ЗАМЫН БООМТООР 94,5 САЯ ТОНН АШИГТ МАЛТМАЛЫН БҮТЭЭГДЭХҮҮН ТЭЭВЭРЛЭЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/11/05     Б.ПҮРЭВДАГВА: АГААРЫН БОХИРДЛЫН ХОРТ ХЭМЖЭЭ 10-14 ХУВИАР БУУРСАН WWW.EAGLE.MN НИЙТЭЛСЭН:2026/11/04     ЗАСГИЙН ГАЗАР ЕРӨНХИЙЛӨГЧИЙН БАЙР СУУРИЙГ ДЭМЖИХГҮЙ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/04     Н.УЧРАЛ: "ОНТРЭ"-ТЭЙ ТУСДАА ХӨОГ БАЙГУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/11/04    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Conclusion Reached to Construct Multi-Level Interchanges at Five Locations www.montsame.mn

Plans are underway to implement the “Multi-Level Interchange” project as part of efforts to develop an efficient road and transport network in the Capital city.
Specifically, the Capital City Governor’s Office reported that a general feasibility conclusion has been reached to implement the project in the first phase at five locations. These include the Monos intersection, the MITS area, the Officers’ Palace roundabout, the pedestrian overpass along Naadamchdyn Road, and the bridge structure on the eastern embankment near the Nart residential complex.
By separating traffic flows through grade separation and creating multi-level interchanges, the project is expected to significantly reduce vehicle conflict points, shorten waiting times caused by traffic signals, and markedly increase road capacity. For instance, in the area surrounding the “Nart” residential complex in Bayanzurkh district, the flood protection embankment currently disrupts road connectivity, forcing drivers to detour via Narny Road and Peace Avenue. This situation increases the load on main roads and also limits rapid response readiness during emergencies.
Therefore, constructing a bridge structure over the embankment would restore road connectivity, shorten travel distance and time for residents, and help alleviate congestion on the city’s major thoroughfares. In other words, implementation of the “Multi-Level Interchange” project is expected to increase the average traffic speed by 7.1 percent.



Published Date:2026-01-19